![DEUTSCHMANN AUTOMATION UNIGATE CL - Powerlink Instruction Manual Download Page 37](http://html1.mh-extra.com/html/deutschmann-automation/unigate-cl-powerlink/unigate-cl-powerlink_instruction-manual_2488374037.webp)
17.6.10
UNIGATE Fieldbus Gateway UNIGATE CL - Powerlink V. 1.8
37
Deutschmann Automation GmbH & Co. KG
Commissioning guide
16.7 Connection to the process device
Please also read the manual for the process device when commissioning the process device.
16.8 Shield connection
Earth the top-hat rail onto which the module has been snapped.
16.9 Connecting the supply voltage
Please connect 10..33 DC voltage to the terminals provided for this.
16.10 Project planning
Use any project planning tool for project planning.
If the required EDS file was not supplied with your project planning tool, a sample file can be
found on the Internet (
www.deutschmann.de
).
Summary of Contents for UNIGATE CL - Powerlink
Page 2: ......