Commissioning guide
Deutschmann Automation GmbH & Co. KG
36
UNIGATE Fieldbus Gateway UNIGATE CL - Powerlink V. 1.8
17.6.10
16 Commissioning guide
16.1 Note
Only trained personnel following the safety regulations may commission the UNIGATE.
16.2 Components
You will require the following components to commission the UNIGATE:
•
UNIGATE
•
Connection cable from gateway to the process
•
Connector for Powerlink connection to the Gateway
•
Ethernet cable (this cable is generally available on site!)
•
10..33 V DC power supply (DIN 19240)
•
Type file or EDS file and user manual (a sample EDS file as well as the user manual can be
ordered separately or downloaded free of charge from our homepage at
www.deutschmann.de).
16.3 Installation
The UNIGATE CL - PL module features protection type IP20 and is thus suitable for switch
cabinet use. The device is designed for snapping onto a 35 mm DIN-rail.
16.4 Dimensional drawing UNIGATE CL - Powerlink
16.5 Commissioning
It is essential that you perform the following steps during commissioning in order to ensure that
the module operates correctly:
16.6 Powerlink connection
Connect the device to the Powerlink network at the interface labeled "Powerlink (Hub)".