CAUTION
PROPERTY DAMAGE HAZARD
Failure to follow this caution may result in water
spillage and/or property damage.
For
any
position
other
than
upflow,
the
multiposition pressure switch must be connected
pneumatically
to
the
condensate
box
and
electrically to the control to allow the furnace
to stop in the event of drain blockage.
Figure 2 – Panel Identification
Figure 3 – Dimensions
Figure 4 – Top view
Figure 5 – Drain Trap Localisation
Figure 6 –
Pressure switch connections for
multipositions
4.1
UPFLOW
The condensate trap must be outside the furnace casing.
Use the 3 port drain trap. The condensate drain hoses
must be routed to the trap through the furnace casing.
Remove the metal knock out on the side of the casing
and route the hoses to the drain trap. Refer to Figure 5.
4.1.1
Uplow Condensate drain connection
1. Remove the knock out from the side of the casing.
See figure 5 for drain trap location in the upflow
9
Summary of Contents for CC15-M-V
Page 18: ...Figure 17 Wiring Diagram 18...
Page 23: ...Figure 25 Direct vent clearance 23...
Page 24: ...Figure 26 Other than Direct vent clearance 24...
Page 34: ...12 PART LIST Figure 27 Exploded view...
Page 35: ...Figure 28 Exploded view continued...
Page 36: ...Table 19 Part list Chinook Compact...
Page 37: ...Table 20 Part list continued...
Page 38: ...13 NOTES 38...
Page 39: ...39...
Page 40: ...40...