![Detex VALUE SERIES EH Installation Instructions Manual Download Page 15](http://html.mh-extra.com/html/detex/value-series-eh/value-series-eh_installation-instructions-manual_2487942015.webp)
101275 Page 15
#10 Sheetmetal screw
10-24 Machine screw
#25 or 9/64"
tap 10-24
#22 or 5/32"
pilot hole
Cutout per
(Caution: This installation is required on fire rated door openings with removable mullion.)
Door
Door frame
98 Strike
98 Strike locator
Mark and drill holes as necessary.
#7 for 1/4-20 machine screws,
For #14 self-drilling screws, no pilot
hole necessary
7/64" for 6-32 machine screws,
9/64" for #6 sheetemtal screws
(see fastener table)
99 strike
For mounting hole locations use Strike Locator (Template) provided.
DRILL CHART
Strike hook
Mullion post
STRIKE HOOK INSTALLATION
Door
Door
Shield (if necessary)
Shim (if necessary)
98 Strike
98 STRIKE INSTALLATION
Align the strike with
the latchbolt.
Firmly tighten screws
(when required)