FREEDOM DC-60 v2.4 (04/2021)
Page 6
Piping (supplied by Dessalator®)
Ø
High-pressure piping from the pump to the membranes and from the membranes to
the control panel. An 8-meter pipe is provided, it should be cut into two parts. The
length of each part is to be determined according to the distance of the different
elements.
Ø
4 special DESSALATOR® fittings* for high-pressure piping (see assembly procedure
in
Appendix A2
).
§
* Including one 90° elbow fitting for the back of the control panel, which can
swivel 360°.
Ø
Fresh water production piping going from the outlet of the membrane block to the
dashboard (6 meters long).
Assembly
1) List of supplies necessary for assembly
Ø
Screws (self-tapping and more).
Ø
Stainless steel ties, Ø 8-16mm and Ø 12-22mm.
Ø
‘Electrician’ plastic ties.
Ø
Teflon tape.
Ø
Loctite 542 liquid or Loctite 577 paste.
Ø
Polyurethane sealant, Sicaflex or equivalent.
Ø
Corrugated sheath for electric cables and high-pressure tubes.
Ø
Braided-core flexible hose, Ø 10mm and Ø 12mm inner diameter (Tricoflex) and 3mm
thick.
Ø
Power cable: 35 to 50mm² for 12 volts; 35mm² for 24 volts depending on the cable
length.
Ø
Various tools (drills, saws, Ø 21mm hole saws, etc.).