background image

                                                                                                         - 6 -                                          

For more information, visit www.desatech.com

 

PENETRATING THE ROOF 
 

To maintain a 1-inch clearance to the pipe on a roof with a 
pitch, a rectangular opening must be cut. 
 

STEP 1:

 Determine the center point through which the pipe 

will penetrate the roof. 
 

STEP 2:

  Determine the center point of the roof.  Pitch is the 

distance the roof drops over a given span, usually 12 inches.  
A 6/12 pitch means that the roof drops 6 inches for each 12 
inches one measure horizontally down from the roof rafters. 
 

STEP 3:

  Use the roof opening chart (figure 12) to determine 

the correct opening length and flashing required. 
 

STEP 4:

  Remove the shingles around the opening measured 

and cut out this section. 
 

STEP 5:

  Add the next sections of the pipe until the end 

penetrates the roofline.  Check to see that the proper 
clearances are maintained.  Extend chimney by adding 
sections of double wall pipe until pipe is a minimum of 30 
inches above the highest point of the roof cutout.  Termination 
and chimney must extend a minimum of 36 inches above the 
highest point where it passes through roof. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
 
 
 
 

 
FLASHING INSTALLATION (V6F-8DM or V12F-8DM) 

Determine the flashing to be used with the roof opening chart.   
Slide flashing over pipe until base is flat against roof.  Replace 
as many shingles as needed to cover exposed area and flashing 
base.  Secure in position by nailing through shingles (see 
figure 13). 
 
DO NOT NAIL THROUGH FLASHING CONE. 
 
 
 
 
 

INSTALLING FLASHING ON A METAL ROOF 
 

When installing the flashing on a metal roof, it is required that 
putty tape be used between the flashing and the roof.  The 
flashing must be secured to the roof using #8 x ¾” screws and 
then sealed with roof coating to prevent leakage through the 
screw holes.  A roof coating must also be applied around the 
perimeter of the flashing to provide a proper seal. 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
STORM COLLAR INSTALLATION  (SC1 or SC2) 
 

Place storm collar over pipe and slide down until it is snug 
against the open edge of the flashing (see figure 14).  Use SC1 
for all round terminations and  SC2 for all terminations with 
slip sections.  Apply waterproof caulk around the perimeter of 
the collar to provide a proper seal. 
 
 
 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 

 

 

 

Figure 12          ROOF OPENING CHART 

PITCH

SLOPE

OPENING "A" MAX

USE FLASHING

(degrees)

(inches)

MODEL NO.

FLAT

0

15

V6F-8DM

0 - 6/12

26.6

16 - 1/8

V6F-8DM

6/12 - 12/12

45.0

20 - 3/8

V12F-8DM

Figure 13       FLASHING INSTALLATION 

Figure 14             STORM COLLAR 

Summary of Contents for (V)C36LH

Page 1: ...nted gas log approved to ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard A DESA hood must be installed when using a vent free gas l...

Page 2: ...DE AIR KIT INSTALLATION PG 3 7 FAN BLOWER KIT ASSEMBLY PG 4 8 CHIMNEY PIPE AND OFFSET INSTALLATION PG 4 5 9 FIRESTOP SPACERS PG 5 10 FLASHING AND TERMINATION PG 6 7 11 FINISHING YOUR FIREPLACE PG 7 12...

Page 3: ...l to Opening of unit 12 minimum Top Spacers 0 minimum Mantel Clearances see page 8 Mantels Chimney Outer Pipe Surfaces 1 minimum MINIMUM MAXIMUM CHIMNEY HEIGHT The minimum height of the chimney measur...

Page 4: ...the fireplace HEARTH EXTENSION A hearth extension projecting a minimum of 16 in front of and a minimum of 8 beyond each side of the fireplace opening is required to protect combustible floor construct...

Page 5: ...nd a wire spacer The pipe sections must be assembled independently as the chimney is installed When connecting chimney directly to the fireplace the inner flue pipe section must be installed first wit...

Page 6: ...pipe passes through a framed opening into an attic space the firestop must be placed into an attic floor as shown in figure 11 PENETRATING THE ROOF OFFSET RISE A B 48 36 24 18 12 4 3 8 16 3 8 9 3 4 2...

Page 7: ...ASHING INSTALLATION V6F 8DM or V12F 8DM Determine the flashing to be used with the roof opening chart Slide flashing over pipe until base is flat against roof Replace as many shingles as needed to cov...

Page 8: ...prevent smoke spillage from one termination to another We suggest that terminations be separated at least 24 inches center to center and stacked at vertical height difference of 18 inches see figure 1...

Page 9: ...owed to assure that both the fireplace and the glass door retain their beauty and function properly Both the flue damper and the glass doors must be fully opened before starting the fire This will pro...

Page 10: ...for fitting connection see figure 22 NOTE Secure incoming gas line to wood framing to provide rigidity for threaded end STEP 4 Repack insulation around gas line and into sleeve opening Seal any gaps b...

Page 11: ...ure 23 Pulling the handle out will free the outside air door to open Pushing the handle in will lock the door close FOR FURTHER OPERATING GUIDELINES INSTRUCTIONS AND WARRANTY INFORMATION PLEASE REFER...

Page 12: ...502 BAG POLY 1 17a 106651 01 PANEL CLOSURE SMOOTH 1 51 16901 STRAPPING 7 16 10 5 18 106687 01 COLLAR DAMPER CAN 1 52 20023 COLLAR STARTER 1 19 106691 01 ROD SCREEN 2 53 20027 RETAINER REFRACTORY 2 20...

Page 13: ...11a For more information visit www desatech com ILLUSTRATED PARTS...

Page 14: ...12 For more information visit www desatech com REPLACEMENT PARTS ACCESSORY PARTS VC36H VC36LH C36H C36LH VC36 I VC36L I CWC36C C36 I C36L I...

Reviews: