background image

www.desatech.com

117541-01B

13

OptiOnal gaS line 

inStallatiOn

Continued

  CAUTION:  All  gas  piping 

and connections must be tested 

for  leaks  after  the  installation 

is  completed.  After  ensuring 

that the gas valve is on, apply 

soap  and  water  solution  to  all 

connections and joints. Bubbles 

forming  show  a  leak.  Correct 

all leaks at once. DO NOT USE 

AN  OPEN  FLAME  FOR  LEAK 

TESTING AND DO NOT OPER

-

ATE ANY APPLIANCE IF A LEAK 

IS DETECTED. LEAK TESTING 

SHOULD BE DONE BY A QUALI

-

FIED SERVICE PERSON.

  WARNING:  Do  not  oper

-

ate an unvented gas log set in 

this fireplace with the chimney 

removed.

If you install a decorative gas appliance (vented 

gas log), the decorative gas appliance must comply 

with the 

Standard for Decorative Gas Appliance 

for Installation in Solid Fuel Burning Fireplaces, 

ANS Z21.60, Z21.84 or RG 2-72

 and shall also be 

installed in accordance with the 

National Fuel Gas 

Code, ANSI  7223NFPA 54 latest edition

.

  WARNING:  If  the  fireplace 

has been used for wood burning, 

the firebox and chimney must be 

cleaned  of  soot,  creosote  and 

ashes  be  a  qualified  chimney 

cleaner.  Creosote  will  ignite  if 

heavily heated.

  WARNING:  When  using  a 

decorative vented gas log, the 

damper  must  be  removed  or 

permanently locked in the fully 

open  position  and  the  glass 

doors must be in the fully open 

position.

Figure 18 - Gas Line Knockout

Side 
Firebrick 

Finished 

Side

Refractory 
Knockout 

Plug

Outside of 

Fireplace

Gas Line 

Conduit

Insulation

Gas 

Conduit 
Cover

1/2" Dowel

Seal 
Opening 
with 
Refractory 
Cement

Outside of 

Fireplace

Gas 
Line 

Conduit

Repack 

Insulation

Incoming 
1/" Black 

Iron Pipe

Side 
Firebrick 

Finished 

Side

Provide Enough Threaded 

End for Fitting Connection

Figure 19 - Gas Line Installation

bRick inStallatiOn

Installation  of  brick  should  be 

done after the fireplace is placed 

in a permanent location.

The brick housing panels are already installed in 

the firebox. Each housing is stamped with a letter 

(full size bricks are not stamped). These letters will 

help identify the brick when installing. It is impor

-

tant to install these bricks exactly as instructed. 

Press the brick firmly into the brick housing until 

it snaps. The groove line on the side of the brick 

will come in contact with the flange on the brick 

housing. This secures the brick into the housing. 

See Figure 20 on page 14.

The bricks are packaged in four separate boxes. 

These boxes are labeled by sections of the fire

-

box.

Box #1 - Hearth Panel

Box #2 - Rear Panel

Box #3 - Left or Right Panel

Box #4 - Left or Right Panel

Remove 
Knockout

Summary of Contents for JM36 Series

Page 1: ...for use with a vented gas log approved to ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved toANS Z21 11 2 standard This wood burning fireplace complies with...

Page 2: ...e of any component part not manufac tured or approved by DESAin combination with a DESA fireplace system Proper installation is the most important step in ensuring safe and continuous operation of the...

Page 3: ...2 AIR SPACE BACK AND SIDES 0 TO BOTTOM GAS LINE KNOCKOUTS 12 EACH SIDE COMBUSTIBLE WALL BOARD NO COMBUSTIBLE MATERIAL ON FACE MINIMUM 12 TO PERPENDICULAR SIDEWALL HEARTH EXTENSION 60 X 20 1 CHIMNEY AI...

Page 4: ...67 11 GAS LINE KNOCK OUTS AIR KIT KNOCK OUT LEFT SIDE OUTSIDE AIR 11 2 AIR SPACE BACK AND SIDES 0 TO BOTTOM GAS LINE KNOCKOUTS 12 EACH SIDE COMBUSTIBLE WALL BOARD NO COMBUSTIBLE MATERIAL ON FACE MINI...

Page 5: ...RIAL TERMINATION SQUARE CHASE TOP ROUND TOP TERMINATION COMBUSTIBLE WALL BOARD NO COMBUSTIBLE MATERIAL ON FACE 0 TO BOTTOM OUTSIDE AIR 11 2 AIR SPACE BACK AND SIDES GAS LINE KNOCKOUTS 12 EACH SIDE MIN...

Page 6: ...allation The minimum height of the chimney measured from the base of the fireplace to the flue gas outlet of the termination is 9 5 feet minimum of 4 feet of chimney pipe sections required for outdoor...

Page 7: ...hearth extension with a non combustible material see Figure 3 WARNING Hearthextension is to be installed only as shown in Figure 3 Fireplace Installation Continued Figure 3 Hearth Extension Seal Gap...

Page 8: ...imney together it is important to assure the joint between the chimney sections is locked Check by pulling chimney upward after locking The chimney will not come apart if properly locked It is not nec...

Page 9: ...3 4 4 OFFSET CHART 22 50 FT SYSTEM HEIGHT Figure 7 Typical Offset Terminations Return Elbow Offset Elbow Return Elbow Offset Elbow 6 Max 6 Max 6 Max 6 Max 6 Max 6 Max Return Elbow Offset Elbow Offset...

Page 10: ...ling Frame Firestop Spacer Screws or Staples Min of 8 Firestop Spacer Screws or Staples Min of 8 Penetrating the roof To maintain a 1 JM36 or 2 JM42 JM50 clear ance to the pipe on a roof with a pitch...

Page 11: ...f using 8 x 3 4 screws and then sealed with roof coating to prevent leakage through the screw holes A roof coating must also be applied around the perimeter of the flashing to provide a proper seal Na...

Page 12: ...her opening When overlapping with a noncombustible facing material use only noncombustible mortar or adhesive Optional Gas Line Installation Gas line hook up should be done by your supplier or a quali...

Page 13: ...s log the damper must be removed or permanently locked in the fully open position and the glass doors must be in the fully open position Figure 18 Gas Line Knockout Side Firebrick Finished Side Refrac...

Page 14: ...RIGHT PANEL HEARTH PANEL AH Q P AG AC AE AF FULL AF AF AP AC AG AT AG Q AI Q AI C C D D FULL C D C G FULL FULL G FULL FULL FULL FULL FULL H H I I M M AB L FULL D C AS C FULL FULL FULL FULL FULL FULL...

Page 15: ...Installation for Model V JM42 Brick Installation Continued See instruction on page 14 before installing brick AO REAR PANEL RIGHT PANEL HEARTH PANEL R FULL FULL FULL FULL FULL FULL FULL B D C A B C A...

Page 16: ...A AB AC AD Box 1 Hearth 36 2 Box 2 Rear 36 2 Box 3 Left or Right 36 1 2 Box 4 Left or Right 36 1 2 TOTAL 4 0 0 0 0 0 0 0 0 0 0 2 4 0 brick matrix for model V JM36 Continued Brick Matrix AE AF AG AH AI...

Page 17: ...W X Y Z AA AB AC AD Box 1 Hearth 42 2 2 2 2 2 2 Box 2 Rear 42 1 Box 3 Left or Right 42 1 1 Box 4 Left or Right 42 1 1 TOTAL 3 2 0 0 2 2 2 2 2 0 2 0 0 0 Brick Matrix V JM42 brick matrix for model V JM4...

Page 18: ...ix Q R S T U V W X Y Z AA AB AC AD Box 1 Hearth 50 Box 2 Rear 50 3 Box 3 Left or Right 50 1 1 Box 4 Left or Right 50 1 1 TOTAL 5 2 0 0 0 0 0 0 0 0 0 0 0 0 Brick Matrix V JM50 brick matrix for model V...

Page 19: ...of grout mixture This will keep the mixture moist and it will not dry out before use 5 Begin grouting by first doing a Filler Pass This is done by filling the joint about 3 4 full with grout mixture...

Page 20: ...door frame into face opening and tighten screws see Figure 25 door frame MODELS BDMO36E G C BDMO42E G C AND BDMO50E G C Installation 1 Remove screws from smoke shelf see Figure 26 2 Mount top door fra...

Page 21: ...he glass must be allowed to warm slowly and evenly The tempered glass will withstand a gradual temperature rise to 550 F which is more than a normal fire will generate Such materials as pitch wax lade...

Page 22: ...tallation in Vented Fireplaces ANSI Z21 60 or American Gas Association draft requirements for Gas Fired Log Lighters for Wood Burning Fireplaces Draft NO 4 dated August 1993 If you wish to install an...

Page 23: ...BDM42E 42 Ebony BDM42G 42 Pewter BDM42C 42 Oiled Bronze BDM50E 50 Ebony BDM50G 50 Pewter BDM50C 50 Oiled Bronze BDMO36E 36 Ebony BDMO36G 36 Pewter BDMO36C 36 Oiled Bronze BDMO42E 42 Ebony BDMO42G 42...

Page 24: ...OT A UPC 117541 01 Rev B 11 05 117541 01 Firestop Spacer FS 10 1100EFS 10DM for model GM36 Roof Flashing V6F 10DM 0 to 6 12 Pitch V12F 10DM 6 12 to 12 12 Pitch Replacement and Accessory Parts Continue...