                                                                                                       - 5 -

For more information, visit www.desatech.com

*For systems with two elbow sets, the minimum height is 22 

feet.  The maximum height for any system is 50 feet. 

OFFSET CHART (22-50 FT. SYSTEM HEIGHT) 

FIRESTOP SPACERS (FS-8DM) 

Firestop spacers are required at each point where the chimney 
penetrates a floor space.  Their purpose is to establish and 
maintain the required clearance between the chimney and the 
combustible materials.  When the pipe passes through a 
framed opening into a living space above, the firestop must be 
placed onto the ceiling from below as shown in figure 10.  
They also provide complete separation from one floor space to 
another or attic space as required by most codes.  When the 
double wall pipe passes through a framed opening into an attic 
space, the firestop must be placed into an attic floor as shown 
in figure 11. 

PENETRATING THE ROOF 

OFFSET

RISE

A

B

48"

36"

24"

18"

12"

4 - 3/8

16 -3/8

9 - 3/4

25 - 1/2

1

12 - 3/4

30 - 3/4

1

15

34 - 3/4

1

18

40

1

1

21 - 1/4

46 - 1/4

1

23 - 3/4

49 - 1/4

1

1

27 - 3/4

56 - 3/4

1

30

60 - 3/4

1

1

33

66 1

1

36

71

1

1

38 - 1/4

75

2

41 - 1/4

80 - 1/4

1

1

1

45

86 - 3/4

2

46 - 3/4

89 - 1/2

1

1

1

51

97

1

1

53 - 1/4

101

2

1

56 - 1/4

106 - 1/4

2

59 - 1/4

111 - 1/2

1

1

1

61 - 3/4

115 - 1/2

2

1

64 - 3/4

120 - 3/4

2

1

68 - 1/4

127

1

2

70

130

2

1

1

74 - 1/4

137 - 1/2

1

2

1

76 - 3/4

141 - 1/2

1

2

1

79 - 3/4

146 - 3/4

4

ELBOW  SET ONLY

CHIMNEY LENGTH

Figure 8         CEILING SUPPORT PIPE 

Figure 9      ELBOW OFFSET 

All pipe connections between the offset and return
must be secured with two screws, only on the outer
pipe, and shall not penetrate the inner stainless. 

Figure 7  

*TYPICAL OFFSET INSTALLATION 

Figure 10               FIRESTOP SPACER 

Figure 11              FIRESTOP SPACER

Summary of Contents for CWC42C

Page 1: ...log approved to ANS Z21 60 Z21 84 or RGA 2 72 standards or for use with a vent free gas log heater approved to ANS Z21 11 2 standard A DESA hood must be installed when using a vent free gas log heater...

Page 2: ...DE AIR KIT INSTALLATION PG 3 7 FAN BLOWER KIT ASSEMBLY PG 4 8 CHIMNEY PIPE AND OFFSET INSTALLATION PG 4 5 9 FIRESTOP SPACERS PG 5 10 FLASHING AND TERMINATION PG 6 7 11 FINISHING YOUR FIREPLACE PG 7 12...

Page 3: ...to Opening of unit 12 minimum x Top Spacers 0 minimum x Mantel Clearances see page 8 Mantels x Chimney Outer Pipe Surfaces 2 minimum MINIMUM MAXIMUM CHIMNEY HEIGHT The minimum height of the chimney me...

Page 4: ...e HEARTH EXTENSION A hearth extension projecting a minimum of 20 in front of and a minimum of 12 beyond each side of the fireplace opening is required to protect combustible floor construction in fron...

Page 5: ...nd a wire spacer The pipe sections must be assembled independently as the chimney is installed When connecting chimney directly to the fireplace the inner flue pipe section must be installed first wit...

Page 6: ...ipe passes through a framed opening into an attic space the firestop must be placed into an attic floor as shown in figure 11 PENETRATING THE ROOF OFFSET RISE A B 48 36 24 18 12 4 3 8 16 3 8 9 3 4 25...

Page 7: ...ASHING INSTALLATION V6F 8DM or V12F 8DM Determine the flashing to be used with the roof opening chart Slide flashing over pipe until base is flat against roof Replace as many shingles as needed to cov...

Page 8: ...stacked at vertical height difference of 18 inches see figure 16 All flue gas outlet of chimney termination must extend a minimum of 3 feet in height above the highest point where it passes through th...

Page 9: ...must be fully opened before starting the fire This will provide sufficient combustion air and maintain safe temperatures in the firebox IMPORTANT The glass must be allowed to warm slowly and evenly Th...

Page 10: ...for fitting connection see figure 22 NOTE Secure incoming gas line to wood framing to provide rigidity for threaded end STEP 4 Repack insulation around gas line and into sleeve opening Seal any gaps b...

Page 11: ...ure 23 Pulling the handle out will free the outside air door to open Pushing the handle in will lock the door close FOR FURTHER OPERATING GUIDELINES INSTRUCTIONS AND WARRANTY INFORMATION PLEASE REFER...

Page 12: ...107805 01 PANEL CLOSURE SMOOTH 1 48 15246 LABEL 3 4 AIRSPACE CLEARANCE 1 15 107809 01 BOTTOM FIREBOX 1 49 16405 INSULATION COLLAR 1 16 107810 01 SURROUND FIREBOX 1 50 16502 BAG POLY 1 17 107811 01 SEP...