background image

  

1. Safety Information............................................................................

  2. Appearance......................................................................................

  3. Connection.......................................................................................

  4. Operation.........................................................................................

  5. LED Indications................................................................................

  6. Night Light Timer..............................................................................

  7. Troubleshooting................................................................................

6SHFL¿FDWLRQV

&HUWL¿FDWLRQV

10. Limited Warranty..............................................................................

3
4
5
6

12
13
16
17
17
18

2

Contents

Thank you for purchasing the 

SolarAmp mini

 solar charge controller. 

This  manual  contains  important  safety,  installation  and  operating 
instructions for the 

SolarAmp mini

 solar charge controller in order 

to prevent the users from any damage. Make sure to read all of the 
instructions and cautions in the manual before beginning installation.

© 2010-2015

  

 DENRYO CO., LTD. All Rights Reserved.

This Document must not be copied, photocopied, reproduced or converted to any
electronic or machine-readable form in whole or in part without prior written approval
of DENRYO CO., LTD.  

Glossary

PV

Photovoltaics Module (Solar Panel)

LVD

Low Voltage Disconnect

D

/

D

Dusk to Dawn

Summary of Contents for Solar Amp mini

Page 1: ...Solar Charge Controller DENRYO CO LTD User s Manual Ver 3 01...

Page 2: ...rating instructions for the SolarAmp mini solar charge controller in order to prevent the users from any damage Make sure to read all of the instructions and cautions in the manual before beginning in...

Page 3: ...3 D 1 Safety Information 1 1 Do NOT short circuit 1 2 Protect from direct rain 1 3 Explosion hazard 1 4 Mounting direction 1 5 Negative earth ground 1 6 Do NOT reverse polarity connection...

Page 4: ...4 MODE SW STATUS LED MODE LED ERROR LED SELECT SW 120 5 20 20 50 mm MODE SW SELECTSW STATUS MODE ERROR RESET P V BATTERY LOAD 2 Appearance...

Page 5: ...between controller and load 3 3 Connect to PV Cover the PV with cloth not to generate electricity 3 2 Connect to load It is recommended to install an external fuses less than 10A between controller a...

Page 6: ...ELECT SW and the number of MODE LED blinks will change Check the MODE LED 1 blink then push the MODE SW Check the number of MODE LED and STATUS LED blinks Push the SELECT SW and the number of STATUS L...

Page 7: ...ED blinks will change Check the MODE LED 2 blinks then push the MODE SW Check the number of MODE LED and STATUS LED blinks Push the SELECT SW and the number of STATUS LED blinks will change The STATUS...

Page 8: ...e Check the MODE LED 3 blinks then push the MODE SW Check the number of MODE LED and STATUS LED blinks Push the SELECT SW and the number of STATUS LED blinks will change The STATUS LED blinks indicate...

Page 9: ...setting push the MODE SW during normal operation and MODE LED will blink Push the SELECT SW and the number of MODE LED blinks will change Check the MODE LED 4 blinks then push the MODE SW Check the n...

Page 10: ...d MODE LED will blink Push the SELECT SW and the number of MODE LED blinks will change Check the MODE LED 4 blinks then push the MODE SW Check the number of MODE LED and STATUS LED blinks Push the SEL...

Page 11: ...blink twice Successfully reset will be completed 4 7 Factory defaul 1 Push MODE SW and SELECT SW simultaneously 2 Keep pushing MODE SW and release your hand from 2 SELECT SW only 3 MODE LED keeps to...

Page 12: ...ht Light ON Dusk to Dawn 3 blinks Night Light ON Normal Timer 4 blinks Night Light ON Rate Timer 4 blinks Timer Detail Setting 1 blink Normal Timer 6h Rate Timer 40 2 blinks Normal Timer 8h Rate Timer...

Page 13: ...rn on in the day time Day Night Light OFF Load is always ON Dusk to Dawn Normal Timer 6h Normal Timer 8h Normal Timer 10h Normal Timer 12h Normal Timer 14h Rate Timer 40 Rate Timer 50 Rate Timer 60 Ra...

Page 14: ...y after insatlling SolarAmp mini at the earliest Soon after installing or sudden bad weather the load will start to turn on by the condition of PV voltage The conditions are as described 1 Solar volta...

Page 15: ...Rate 70 Rate 80 SolarAmp mini rate timer is different from a traditional night light timer The lighting time of load is set by a rate of night time Even if the night time is changed seasonally the li...

Page 16: ...akes approximately 3 minutes to start charging from PV voltage In the event of a battery fault the charge controller will not charge On the other hand the charge controller will not charge when batter...

Page 17: ...emperature 20 60 Storage Temperature 30 70 Humidity 5 95 RH non condensing Dimensions D x W x H 20 x 50 x 120 mm Weight 105 g Wire Size 16AWG 1 3 mm2 22AWG 0 33 mm2 Battery Type Sealed Flooded AGM Gel...

Page 18: ...DENRYO CO LTD 28 5 Nishinippori 2 Chome Arakawa ku Tokyo 116 0013 Japan TEL FAX E mail Website 81 3 3802 3671 81 3 3802 2974 info en denryo com www denryo com...

Reviews: