![Denjoy DY-GP Plus User Manual Download Page 11](http://html1.mh-extra.com/html/denjoy/dy-gp-plus/dy-gp-plus_user-manual_2480238011.webp)
Rev. 02/01/18 VER SMS-DYGP-PLUS-FREEFILL20170828-EN
19
7. After use, extended press POWER button for switch off, if necessary.
8. Remove the heat tips, clean the device and related accessories for next use.
Remarks
※
During the process of heating, extended press the button of 10S can
switch off heating automatically.
※
Warning Tone: 1 sound for normal operation, 2 for reminder, 3 for
incorrect operation or invalid operation.
※
For the sake of safety, do not allow heat tips to stay in the root canal
for more than 5S during the working condition.
C. Charging System
1. Checking the charging state, when the battery is charging, the indicator light
shows red color, when the battery is fully charged, the indicator light shows
green.
2. When the battery is charging or stop using, please do not put it near metal
in order to avoid the short circuit of the machine.
3. Please do not use other adapter if the adapter is damaged, please contact
with distributor or manufacturer for solution!
Remarks
※
1) Heat tips, injection needles and heat insulator
must be sterilized
before use;
※
2) Because of the rapid warming and cooling characteristics of the
FreeFill pen, special care is needed to avoid any accidents by burning;
※
3) The FreeFill gun can enter the root canal after heating, and pay
attention to prevent it from being burned by injection needle;
※
4) The FreeFill gun is forbidden to pull the trigger when gutta percha
bar is inserted, but the heating function is not turned on, so as to avoid
mechanical trouble.
Rev. 02/01/18 VER SMS-DYGP-PLUS-FREEFILL20170828-EN
20
SECTION 7: APPLICATION OF ROOT CANNAL FILLING
First-Phase Preparation
1) Gutta percha point (Master cone)
Select the appropriate gutta percha point as a master cone which has same
taper and size with prepared root canal. Shorten 0.5-1 mm
of the point than
working length to avoid overfilling and to secure enough space to fill
additional point.
2. Hand plugger
Prepare 2-3 hand plungers to compact the filled gutta percha.
3. Pen tips
Select the appropriate pen tip and sign the working length by using callipers,
The signed working length should be 5-7 mm short than the length of root
canal and make sure the pen tip size will not touch the root canal.
4. Pen tips
Please select the appropriate size of pen tip according to the thickness at the
2/3 position of root canal coronal.
A.
Vertical Condensation/Down Pack
1. Dry the root canal, apply a thin layer of root canal sealer on the root canal
wall, and put the GP cone in position.
2. Confirm the working length, warm the selected pen tip and cut off excess GP
cone.
3. Put the gutta percha cone inside the root canal and then push it slowly into
the apex by using warmed pen tip until the pen tip is 5-7 mm from the apex
then stop warming the pen tip. (The whole process should be finished in 7-9
seconds)
4. Softly press the gutta percha cone for 10 seconds, warm the pen for 1
second again, and take out residual gutta percha cone. Compact the warmed
gutta percha by using the hand squeezing device.
5. If the root canals need to place the post pin, the backfilling process can be
omitted, leaving enough space for the post pin. If not, backing filling it with
obturation gun.