
SECTION V – ASSEMBLY PROCEDURES
SHUTTLE VALVE ASSEMBLY
1. Place valve assembly (20) in a horizontal position with the O-ring groove up.
Internal Drain
2. Press seat (11) in the .500” diameter bore until it is flush with the body surface.
3. Install spool (5) in body bore.
4. Install spring centering washer (4) over each end of spool.
5. Install springs (3) over ends of spool and into sockets of centering washers.
6. Lubricate O-rings (2) and install over plugs (1). Install the plugs over springs and into
body.
7. Install spool (10) in bore against seat (11).
8. Install spring (9) in spool (10).
9. Lubricate O-ring (8) and install in groove of plug (7) on internally drained shuttle.
10. Install plug (7) over spring (9) and tighten.
11. Install seal (17) in counter-bore in the center of shuttle valve assembly. Hold in place
with a coating of grease. Install two seals in remaining counter-bores.
12. Install shuttle valve assembly on port block pad and secure with screws (19). Torque
screws to 20 ft. lbs.
FIGURE 10
ASSEMBLY, SHUTTLE VALVE
NO.
QTY.
PART NUMBER
DESCRIPTION
1
2
488-35002
Plug
2
2
691-00908
O-ring
3
2
033-70515
Spring
4
2
033-70495
Washer, Spring Centered
5
1
033-70529
Spool
6
1
033-53117
Body
7
1
033-72129
Plug
8
1
691-00906
O-ring
9
1
033-71923
Spring, Relief Valve
10
1
033-71925
Spool, Relief Valve
11
1
033-53154
Seat
12
Not shown
13
Not shown
14
2
345-20004
Shim Washer
Reference – Orifice P/N 033-53523 for Shuttle S13-48776
21
Summary of Contents for Goldcup 6
Page 9: ...SECTION IV ASSEMBLY TOOL DRAWINGS 8...
Page 14: ...SECTION V ASSEMBLY PROCEDURES 13...
Page 21: ...SECTION V ASSEMBLY PROCEDURES 20...
Page 24: ......