
SECTION V – ASSEMBLY PROCEDURES
BARREL HOLD-DOWN
1. Install seal ring (3) on hold-down shaft. Position bearing (2) between the two thrust
Figure 8
washers (1) and install around the seal ring.
2. Install hold-down nut (4) on the shaft and tighten no more than 10 ft. lbs. max. Back off
the nut until
second slot
is aligned with cotter pin hole in the shaft. Install cotter pin (5)
through nut and shaft and bend one tang over the end of the shaft.
3. Place O-ring (7) on end cover (6) and lubricate. Install end cover over hold-down nut
(4).
4. Depress cover and install snap ring (8). Make certain that snap ring is properly seated
in groove.
PARTS LIST FOR FIGURE 8
NO. QTY.
PART NO.
DESCRIPTION
1
2
350-10065
Thrust Washer
2
1
230-82131
Bearing NTA-1625
3
1
033-70510
Seal Ring
4
1
033-53922
Hold-down nut
5
1
322-03324
Cotter pin 3/32 x 1
6
1
033-70537
End cover
7
1
671-00138
O-ring
8
1
356-65095
Internal Snap Ring
17
Summary of Contents for Goldcup 6
Page 9: ...SECTION IV ASSEMBLY TOOL DRAWINGS 8...
Page 14: ...SECTION V ASSEMBLY PROCEDURES 13...
Page 21: ...SECTION V ASSEMBLY PROCEDURES 20...
Page 24: ......