3. Maintenance and Troubleshooting
H-110-200E V00
Page 15
Pump head to drive end Installation:
1.
Turn the crankshaft to align the plungers as shown.
2.
Place the head evenly onto the plungers and push it until it makes contact with the
drive end of the pump.
3.
Torque the head bolts as shown in the tightening sequence diagram.
Torque Specification:
Descriptions
Pump Head
Piston Nut
Valve Cap
In .lbs
133
106
442
Kg.m/N.m
15
12
50
Summary of Contents for H-110-200E
Page 20: ...4 Spare Part List H 110 200E V00 Page 19 Boiler assembly H 110 200E ...
Page 23: ...4 Spare Part List H 110 200E V00 Page 22 Pump assembly H 110E ...
Page 26: ...4 Spare Part List H 110 200E V00 Page 25 Pump assembly H 200E ...
Page 34: ...4 Spare Part List H 110 200E V00 Page 33 H 200E 220V 60Hz Standard ...