4
[email protected] | 1.877.502.3434
www.delviro.com
1
ZIP LIGHT
INSTALLATION INSTRUCTIONS
4.
At the top of the Jack Chain attach an S-Hook to the Jack Chain and the other end of the Jack Chain to an eye lag screw.
The installer should choose the proper eye lag screw as there are different types used for wood, steel and concrete.
Minimum eye lag screw should be #12 size.
5.
Pull the existing wire from the Zip Light fixture into the junction box. Use a strain relief on the access plate if required.
Connect the appropriate wires using wire nuts (Black to Black, White to White and Green to Ground wire). Ensure the
ground wire is also grounded to the junction box using a ground screw. The wire from the Zip Light fixture can be tied
wrapped to the jack chain but also has to be independently supported to the ceiling or roof. Check to see if the Zip Light
fixture is securely in place and that the jack chain is properly attached to the ceiling and the fixture.
6.
Ensure the Zip Light fixture is connected to a timer, relay system, motion detector or switch so that it can be activated easily.
7.
Check all connections for open loops and replace loose or damaged wires if necessary.
8.
Turn the electrical power on from the electrical panel.
9.
Test the connection by turning on the timer, relay system, motion detector or light switch that the Zip Light fixture is connected to.
Eye-Lag Screws (Quantity: 2)
C
S-Hooks (Quantity: 2)
A
A
C
Wire can be tie wrapped to pipe but also has to have
an independent support at the ceiling