Notsi, Ltd., Bulgaria, 9027 Varna, Troleyna 12 street
Ph.: 00359 899 822010 ; Fax: 00359 52 507227
Web:
www.deltapulse.eu
; E-mail:
Mole Impulse Pro operation manual
2
QUICK START
OPTIMAL POSITIONS:
- POWER, NOISE, THRESHOLD, GAIN
– move each control slowly to position
10.
- SIGNAL
–
from position 10 slowly return to a position around 7. The machine is
very stable at 10 but the depth is better around 7.
After all these settings press FAST ZERO.
IMPORTANT: when placing the coil at working height (eg 20-30 cm above
ground) should press FAST ZERO again.