
14
Operation and installation manual SOLIVIA 2.5 AP G3 TR
● PV- grounding (grounding monitoring of the negative pole of the PV generator).
In these modes the solar inverter remains in feed-in operation and will not be discon-
nected from the grid in case of a fault. The error message “PV+ grounding fault” or “PV-
grounding fault” will appear on the display.
If you need to connect the positive or negative pole of the PV system to meet require-
ments set out by the module manufacturer, you can do this. Earth continuity must be
implemented close to the inverter. We suggest using Deltas grounding kit “Grounding
Set A Solar” (EOE99000275). The grounding connection is monitored and should be
configured in the Setup menu (see
„8.3.7 Submenu S (Setup)“, page 28
).
Alternatively, it is possible to turn off the insulation- and grounding monitoring:
● ISO / GND OFF.
Required cable coupler types for DC cable connection to inverter:
CABLE
COuPLER
POLARITY
WIRE SIZE
2.5 MM
2
(AWG 14)
WIRE SIZE
4.0 MM
2
-
6.0 MM²
(AWG 12-10)
FEMALE
CABLE
COuPLER
MALE
CABLE
COuPLER
MuLTI-COnTACT
ORDER nuMBER
Plus
coupler
●
●
32.0010P0001-UR
32.0012P0001-UR
Minus
coupler
●
●
32.0011P0001-UR
32.0013P0001-UR
Plus
coupler
●
●
32.0014P0001-UR
32.0016P0001-UR
Minus
coupler
●
●
32.0015P0001-UR
32.0017P0001-UR
7.7.1 Output power over PV voltage
150 VDC
200 VDC
250 VDC
300 VDC
350 VDC
400 VDC
450 VDC
2500 W
2700 W
2900 W
3100 W
3300 W
3500 W
3700 W
Summary of Contents for SOLIVIA 2.5 AP G3 TR
Page 1: ...SOLIVIA 2 5 AP G3 TR Operation and installation manual ...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 2 5 AP G3 TR ...
Page 46: ...44 ...
Page 47: ......