EN
11
Operation and installation manual SOLIVIA 2.5 AP G3 TR
7.2
Minimum requirements
● Free convection around the solar inverter must not be impaired.
● For proper air circulation to dissipate heat, allow a clearance of approx. 10 cm to
the side and approx. 50 cm above and below the unit.
● The grid impedance requirement at the supply terminal is to be observed (cable
length, cable cross-section).
● The recommended installation position is to be adhered to (vertical).
● Unused DC connectors and interfaces must be sealed airtight with sealing plugs to
ensure protection class IP65 for the whole system (inverter & cables).
50 cm
10 cm
50 cm
10 cm
Wall
Wall
7.3
Maintenance
Make sure that the device remains uncovered while in operation. To avoid the casing of
the solar inverter becoming soiled, it should be cleaned periodically.
User serviceable parts are not contained in the device. Under no circumstances should
the solar inverter be opened!
7.4
Installation
You should utilize the delivered mounting plate for problem-free installation of the solar
inverter. Installation to the wall should be implemented with the proper screws. Mount
the wall bracket so that the solar inverter only has to be simply attached. After that, the
device is to be bolted on securely.
Assembly instructions
1. Mount the mounting plate with appropriate screws (max. Ø 6mm) into at least four
of the eight holes to fix the wall bracket in place. You can employ the mounting
plate as a template for marking the positions of the boreholes.
2. As the solar inverter weighs 21.5 kg, it should be lifted out of the transport crate by
at least two persons.
Summary of Contents for SOLIVIA 2.5 AP G3 TR
Page 1: ...SOLIVIA 2 5 AP G3 TR Operation and installation manual ...
Page 2: ......
Page 4: ...2 Operation and installation manual SOLIVIA 2 5 AP G3 TR ...
Page 46: ...44 ...
Page 47: ......