20
Quick installation guide for RPI M15A M20A inverters
Setting the AC connection type
1.
When the default information is displayed, press the button
ESC
to open the main menu. Otherwise, repeatedly press
the button
ESC
until the main menu is displayed
20
15
10
5
0 4
8
12
16
20
24
P(w)
Runtime: 8.2Hrs
Power: 12103W
On Grid
21. Jun 2013 09:30
E-Today: 47kWh
2.
Use the buttons
and
to select
Settings
To confirm your selection, press the button
ENT
E-Today
E-Today
Power Meter
Energy Log
Event Log
Inverter Information
Settings
Operation Data
21. Jun 2013 09:30
Menu
3.
Use the buttons
and
to select
Install Settings
To confirm your selection, press the button
ENT
Personal Settings
Personal Settings
Coefficient Settings
Coefficient Settings
Install Settings
Active/Reactive Power Control
FRT
21. Jun 2013 09:30
Settings
4.
Use the buttons
and
to select
AC Connection
To change the settings, press the button
ENT
Reconnection Time
Reconnection Time
AC Connection
RCMU
Grid err. Lock
[
[
] S
]
3P4W
[
] %/m
10
[
]
OFF
60
60
21. Jun 2013 09:30
Install Settings
5.
Use the buttons
and
to select
3P3W
To confirm your setting, press the button
ENT
Reconnection Time
Reconnection Time
AC Connection
AC Connection
RCMU
Grid err. Lock
[
[
] S
]
3P3W
[
] %/m
10
[
]
OFF
60
60
21. Jun 2013 09:30
Install Settings
Per default, the AC connection type is set to 3P4W (3 N + PE). Only if you use an AC connection
with 3 PE (3P3W), you need to change this setting. For a description of the AC connection, see
“Connecting to the grid (AC)”, p. 8.