6.3 Low Voltage Ride Through (LVRT)
According to CEI 0-21, 8.5.1
To avoid undue separation from the network if voltage dips occur, a generation system
with over 6 kW total power must be able to comply with certain functional requirements,
which are known as LVRT(Low Voltage Ride Through) in international literature.
100%
0
time(ms)
U
grid /
U
n
2
1
90 %
40 %
3
200
400
0%
85 %
110%
Figure 6-4
:
LVRT characteristic
33
Active/Reactive Power Control and LVRT (Optional)
Summary of Contents for RPI-H3
Page 2: ......
Page 12: ...Figure 2 3 The identification label for H5 RPI H5 12 Installation and Wiring...
Page 15: ...Figure 3 4 LCD display and buttons 3 2 1 LCD Display and Buttons 15 Product Overview...
Page 18: ...Figure 4 1 Screw the mounting bracket for RPI H3 18 Installation...
Page 19: ...Figure 4 2 Screw the mounting bracket for RPI H5 19 Installation...
Page 60: ......
Page 61: ......
Page 62: ......
Page 63: ......
Page 64: ...Version 04180115 5013208606...