■ Using 1 inverter
(1) Remove the communications connectors from the inverter, and thread the cables through the
waterproof gasket.
※
If the removal method is unclear, see the inverter Operation and Installation Manuals.
(2) Hold down the top of the terminal block on the communications connectors, and insert the cables
as follows: 1 VCC, 2 GND, 3 DATA+, 4 Data-.
Check that the cables have been inserted securely.
■Cables
・
Make sure to use RS-485 cables.
Prepare 0.3 to 0.5mm
2
x single wire, 4 cores (twin wires rather than 2 pair) shielded cables
(rated temperature: 80ºC to 85ºC).
・
Read the inverter Operation and Installation Manuals while working.
・
If connecting multiple inverters, complete the settings so that there are no duplicate IDs.
・
Process the cables before use.
Recommended cable: FCPEV-NC 0.65mm
(3)
Turn ON the DIP switch on the communications director.
13
8mm
Cable
40mm
Φ
0.6~0.8
Φ
5~6
ON
1
To the Power Monitor
3
.Setting
3.1.Setting the Communications Unit
Setting