
39
Installation Instructions for the Hybrid E5 Battery Storage System EU V1 EN 2018-09-17
Overview
Cable gland
∅
10 mm
∅
8,7 mm
∅
7,2 mm
The inverter has 1 cable gland for the communications
cable with 2x2 cable feed-throughs.
Cable requirements
● Shielded twisted-pair cable (CAT5 or CAT6)
● Cable diameter: 7.2 / 8.7 / 10.0 mm
● Wire cross-section: 0.25 ... 1.5 mm
2
The communications cable is required for connection to
the following units:
● Power Monitor (part of the Hybrid E5 System, con-
nection is necessary)
● Power meter (part of the Hybrid E5 System, connec-
tion is necessary)
● Alarm (external device, connection is optional)
● Ripple control receiver (external device, connection is
optional)
● External switch off (external device, connection is
optional)
● PC
Overview of communications card
The connections for RS485, the digital
inputs, the dry contacts and the external
power-off (EPO) are all on the communica-
tion card. This means that the installation
work can be combined.
5
1
3
4
2
1
Protection against electromagnetic interference (EMI)
2
1 x dry contacts (terminal box)
3
DIP switch for the RS485 termination resistor
4
RS485 (terminal block)
5
Digital inputs and external power-off (terminal block)
RS485 terminal block
1 VCC (+24 V; ≤ 0.8 A)
Voltage supply for Smart
Monitor R4E
2 GND
3
DATA+ (RS485)
Data connection to Smart
Monitor
4
DATA– (RS485)
5
DATA+ (RS485)
Data connection to P1E/
P3E power meter
6
DATA– (RS485)
Connect the communication card of the inverter