EV Ultra
Fast Charger Commissioning
17
6
Commissioning
Make sure that the control power breaker is open and that all power module breakers and RCDs
are closed.
Figure 12 Control power breaker open
Close main fuses.
Close the control power breaker.
Fix cabinet hatches back again.