EV Ultra
Fast Charger Load-management connection installation
19
Make sure ioLogic R1212 device is set with value 1 in X1 position (refer to 0).
Make sure ioLogic R1212 device is set with value 1 in X10 position (refer to 0).
Make sure ioLogic R1212 device is set off in Dual Run (refer to 0).
Figure 14 ioLogic settings
Connect L, N and PE cables to terminals.
Switch on MCB.
Confirm ioLogic R1212 device
is signalling “PWR” and RDY statuses.
Figure 15 Load-management connection box
– connection diagram
kWh (Impulse) +A
EVC
A
0
1
S
0
+
N
Power meter
Cat5e, outdoor cable
A
0
1
S
0
-
15 min
(Messperiode)
L1
GND
RS485
RUT955
Resistor 120 Ohm
Resistor
120 Ohm
1 2 3
4 5 6
120
Load-management
connection box
L
N
B2
DI0
DI1
COMM
GND
G
N
D
V
-
V
+
D
1
-
D
1
+
12V
DC
AC
V+
V-
L N
G
N
D
Address: 11
GND
ioLogic
R1212
1
mm
2
1
mm
2
120
A
0
1
S
0
+
A
0
1
S
0
-
D
(+
)
D
(-
)