11.0 Installation of Chamber - Section D3
Fill void between soil and chamber with concrete
(min. C35 grade) or as per engineer's drawings.
29
Completely fill chamber with water.
28
Backfill around chamber with concrete
To be followed when installing chamber in the ground with a reinforced cage.
Allow concrete to cure.
30
Delta Dual V4/V6
18
For technical support, please call 01279 757400