For technical support, please call 01279 757400
17
11.0 Installation of Chamber - Section D2
Fill void between soil and chamber with concrete
(min. C35 grade) or as per engineer's drawings.
26
Completely fill chamber with water.
25
Backfill around chamber with concrete
To be followed when installing chamber in the ground.
Allow concrete to cure.
27
Delta Dual V4/V6