11.0 Installation of Chamber - Section C
Connecting discharge and cable duct
Wrap the thread on a DMS-0153 high pressure
male iron with PTFE tape.
Apply DMS-0158 high pressure glue around the first
20mm of the external face of the discharge and cable
duct pipe and internal side of their respective male iron.
17
19
Screw the high pressure male iron into the female iron.
Push discharge and cable duct pipe into their
respective male iron, twisting the pipe as it is pushed
into the male iron to remove any trapped air.
18
20
Delta Dual V4/V6
14
For technical support, please call 01279 757400