Delta SCARA Robot System User Manual
SCARA CE Series
106
5.
Connect L and N of the power cable to where L and N is marked on the primary power breaker, and
connect the ground cable to the point marked PE on the grounding copper. Place the protection
cover back on once installation is complete, as shown in Figure 7.6.
Figure7. 6 Power cable and ground cable installation location
Note:
Since the robot is a semi-finished product system, please add a filter . reactor and Ferrite Core to the
power line sent to the controller in order to ensure the power has no noise and hormonic, as shown in
Figure 7.7
Figure7. 7 Add filter & reactor to the controller power
220V~+PE
Line Filter
16DPCG5-1
[Delta]
Reactor/20A/9.5mH
Ferrite core
FC0900B-1
[Beecore]
Summary of Contents for DRS40L3SOADF003
Page 1: ...Delta SCARA Robot System User Manual SCARA CE Series 1 ...
Page 59: ...Delta SCARA Robot System User Manual SCARA CE Series 59 ...
Page 113: ...Delta SCARA Robot System User Manual SCARA CE Series 113 ...
Page 115: ...Delta SCARA Robot System User Manual SCARA CE Series 115 ...
Page 129: ...Delta SCARA Robot System User Manual SCARA CE Series 129 ...