24
25
EN
❶
Remove the cover
❷
Mount the unit with a set of screws/sprigs
compatible with the substrate
(not included).
❸
Connect the elements
(refer to the 'connection' §).
Fasten the cables using the nylon screws
provided.
❹
Remove the temporary partitions to run
the cables to the required locations,
then close the unit.
2/ MOUNTING AND CONNECTING THE
TECHNICAL UNIT
Green Status
LED (ST)
Red circulator and burner
LEDs (P and G)
Red valve
LEDs (1 to 8)
On
Normal
operation
Relay closed
Output on
On
Off
Initial heating
of the slab
Relay open
Output off
Off
Slow fl ashing
... ... ...
.. .. .. .. ..
Association mode
-
-
Quick fl ashing
... ... ...
.. .. .. .. ..
Defect in progress
-
Defect in
progress
1
ON
6
5
4
3
2
DIP
88
7
Confi guration
switches
Status LED
Water
monitoring input
Circulator LED
Burner LED
Change-over
input/output
Valve outputs
Valve supply
Master switch
Bus
Valve output LEDs
1/ OVERVIEW OF THE TECHNICAL UNIT
1
ON
6
5
4
3
2
DIP
88
7
DIP
1
ON
6
5
4
3
2
DIP
88
7
Ê
Ë
Ì
Í
Burner and
circulator outputs