23
HED-HCAT SE FREE COOLING
ENGLISH
- Remove the door of the electrical panel, setting QS to OFF
- Place the compressor thermal overload switch QM1 in
the ON position
- Close the electrical panel door and fasten the screws
- Place the switch main QS of the appliance in the ON po-
sition
- Replace the inspection panel
- Place the main switch of the unit QF (outside of the unit)
in the “ON” position
ACTIVATING AND DEACTIVATING THE UNIT
- Place the remote switch SA1 (if present) in the ON position.
- The ACTIVATION and DEACTIVATION operations are
controlled by the combined HED internal unit
OFF
ON
OFF
ON
ON
OFF