NOTE: Retain the castings for future rack requirements. It is not necessary to remove the rear flange
castings.
1.
Remove the castings from the front of each ReadyRails assembly, as shown in item 1 in the following
figure. Remove the two screws from each front flange ear (on the switch side of the rail) with a Torx
driver.
2.
Attach one rail to the front post flange with two user-supplied screws, as shown in item 2 in the
figure.
Figure 5. Two-post Flush-mount Configuration
3.
Slide the plunger bracket forward against the vertical post and secure the plunger bracket to the post
flange with two user-supplied screws, as shown in item 3 in the figure.
4.
Repeat this procedure for the second rail.
22
Install the Hardware
Summary of Contents for S4820T
Page 1: ...Installing the S4820T System April 2014 ...
Page 16: ...16 ...
Page 28: ...28 ...
Page 34: ...34 ...
Page 38: ...38 ...
Page 44: ...44 ...
Page 49: ... Dell Networking PVST MTU 12 000 bytes Technical Specifications 49 ...
Page 50: ...50 ...
Page 56: ...56 ...