Installing ReadyRails — Tool-less Method
Use this installation method for four-post square hole or unthreaded round hole.
1.
With the ReadyRails flange ears facing outward, place one rail between the left and right vertical
posts. Align and seat the rear flange rail pegs in the rear vertical post flange. In the following figure,
item 3 and its extraction shows how the pegs appear in both the square and unthreaded round holes.
Figure 4. Tool-less Configuration
2.
Align and seat the front flange pegs in the holes on the front side of the vertical post, as shown in
item 1 in the figure.
3.
Align and seat the rear flange pegs in the holes on the rear side of the vertical post, as shown in item
2 in the figure.
4.
Repeat this procedure for the second rail.
5.
To remove each rail, pull on the latch release button on each flange ear and unseat each rail, as
shown in item 4 in the figure.
20
Install the Hardware
Summary of Contents for S4820T
Page 1: ...Installing the S4820T System April 2014 ...
Page 16: ...16 ...
Page 28: ...28 ...
Page 34: ...34 ...
Page 38: ...38 ...
Page 44: ...44 ...
Page 49: ... Dell Networking PVST MTU 12 000 bytes Technical Specifications 49 ...
Page 50: ...50 ...
Page 56: ...56 ...