Ra c k I n s t a l l a t i o n G u i d e
1-5
F i g u r e 1 - 2 .
V e r s a R a i l s R a c k K i t C o n t e n t s
Installation Tasks
Installing a rack kit involves performing the following tasks in their numbered order:
1
Removing the rack doors
2
Marking the rack
3
Installing the slide assemblies in the rack
•
RapidRails slide assemblies
•
VersaRails slide assemblies
4
Installing the system in the rack
5
Installing the cable-management arm
6
Routing cables
7
Replacing the rack doors
Removing the Rack Doors
See the procedures for removing doors in the documentation provided with your rack
cabinet.
CAUTION: Because of the size and weight of the rack cabinet doors, never
attempt to remove or install them by yourself.
CAUTION: Store the two doors where they will not injure someone if the doors
accidently fall over.
slide assemblies (2)
10-32 x 0.5-inch flange-head
Phillips screws (10)
cable-management arm
stop blocks (2)
status-indicator cable
5X860eb0.fm Page 5 Monday, October 21, 2002 11:49 AM