Figure 135. Remove default I/O panel
6. Using a #2 screwdriver and two M3 screws, secure the replacement Canbus I/O panel to the top panel.
Figure 136. Attach the replacement I/O panel
7. Use a 5 mm hex socket to install the Canbus ports to the Canbus I/O panel using the four standoff H4 screws.
80
Installation procedure for 2x Canbus uFM module
Summary of Contents for EMC Edge Gateway 3200
Page 34: ...Figure 48 Rear panel screw locations 34 Installation procedure for 2x RS 422 485 uFM module ...
Page 75: ...Figure 127 Rear panel screw locations Installation procedure for 2x GbE LAN 75 ...
Page 102: ...Figure 175 Rear panel screw locations 102 Installation procedure for 8x DI O uFM module ...