![Dell EMC Edge Gateway 3200 Service Manual Download Page 47](http://html.mh-extra.com/html/dell/emc-edge-gateway-3200/emc-edge-gateway-3200_service-manual_81794047.webp)
Installation procedure for 2x GbE with PoE
out
About this task
Table 8. Expansion module packing list
Item
Quantity
Notes
Screw M3 x 4L
1
Torque required: 4.0 kgf.cm
Screw M3 x 5L
2
Torque required: 4.0 kgf.cm
Screw M2.5 x 3L
1
Torque required: 3.0 kgf.cm
Standoff M3 x H5
1
Torque required: 4.5 kgf.cm
Standoff M3 x H5 (BOSS)
2
Torque required: 4.5 kgf.cm
Wire mount
2
–
Sheet metal rear I/O panel
1
-
PoE PCBA
1
–
PoE mPCIe
1
-
Cable
2
-
Thermal pad
1
–
Steps
1. Remove the five screws from the rear panel using a #2 screwdriver.
Figure 72. Rear panel screw locations
2. Remove the rear panel.
IV
Installation procedure for 2x GbE with PoE out
47
Summary of Contents for EMC Edge Gateway 3200
Page 34: ...Figure 48 Rear panel screw locations 34 Installation procedure for 2x RS 422 485 uFM module ...
Page 75: ...Figure 127 Rear panel screw locations Installation procedure for 2x GbE LAN 75 ...
Page 102: ...Figure 175 Rear panel screw locations 102 Installation procedure for 8x DI O uFM module ...