![Dell EMC Edge Gateway 3200 Service Manual Download Page 76](http://html.mh-extra.com/html/dell/emc-edge-gateway-3200/emc-edge-gateway-3200_service-manual_81794076.webp)
Installation procedure for 2x Canbus uFM
module
About this task
Table 10. Expansion module packing list
Item
Quantity
Notes
Screw M2.5 x 3L
1
Torque required: 3.0 kgf.cm
Standoff #4-40 H4
4
Torque required: 4.5 kgf.cm
Wire mount
2
–
Sheet metal Canbus I/O panel
1
-
Canbus mPCIe
1
-
Cable
2
-
Steps
1. Remove the five screws from the rear panel using a #2 screwdriver.
Figure 128. Rear panel screw locations
2. Remove the rear panel.
VI
76
Installation procedure for 2x Canbus uFM module
Summary of Contents for EMC Edge Gateway 3200
Page 34: ...Figure 48 Rear panel screw locations 34 Installation procedure for 2x RS 422 485 uFM module ...
Page 75: ...Figure 127 Rear panel screw locations Installation procedure for 2x GbE LAN 75 ...
Page 102: ...Figure 175 Rear panel screw locations 102 Installation procedure for 8x DI O uFM module ...