Figure 81. Wire mount and thermal pad installed
8. Use a 6 mm hex socket to install the two H5 BOSS standoffs, then use a 5 mm hex socket to install the H5 standoff.
Figure 82. Standoffs installed
9. Place the PoE PCBA on the three standoffs. Align the inside edge of the PCBA with the BOSS standoffs, as shown in the
following figure.
52
Installation procedure for 2x GbE with PoE out
Summary of Contents for EMC Edge Gateway 3200
Page 34: ...Figure 48 Rear panel screw locations 34 Installation procedure for 2x RS 422 485 uFM module ...
Page 75: ...Figure 127 Rear panel screw locations Installation procedure for 2x GbE LAN 75 ...
Page 102: ...Figure 175 Rear panel screw locations 102 Installation procedure for 8x DI O uFM module ...