38 | Dell EMC VxRail Appliance Operations Guide
© 2017 Dell Inc. or its subsidiaries.
FTM considerations
When a drive or node fails, and there is free capacity and enough available nodes, data is
rebuilt to ensure compliancy with the SPBM rules. If there are not enough resources, data is still
available but a subsequent failure could result in data unavailability. Therefore the best practice
is to always configure the cluster with enough nodes to allow data to be rebuilt.
The following table contrasts the requirements/recommendations for data protection and
compares the requirements for mirroring and RAID 5/6 erasure coding for the different FTT
values.
Table 2. Requirements/recommendations for data protection
Note the number of nodes required for compliance and the recommended number of nodes that
allows data to rebuilt and maintain compliancy with the SPBM policy.
Summary of Contents for VxRail Appliance
Page 86: ......