Installation
3
1-DN60 U-shaped card
7-M4 screw nut 8*4
2-U-shaped board
8-“8”shaped clip 25&32
3-Handle sleeve
9-M4 screw*25*2
4-DN40 U-shaped card
10-handle
5-M6 screw nut*8
11-DN32PVC Bracket
6-Rainproof elbow
12-1 inch inner wire straight pipe joint
Chapter 3 Installation
3.1 Sensor Installation
Refer to the pictures in this section to install and fix the sensor. To ensure that the sensor can
measure safely and accurately, the following conditions must be met during installation:
Choose a location that is convenient for operation and maintenance to install the sensor.
The ORP sensor needs regular maintenance;
The electrode installation angle is within ±30°, and the electrode cannot be installed
horizontally or upside down;
Do not remove the protective cap when installing the electrode on site, and then remove
the protective cap after the installation is over.
Figure 2 Schematic diagram of railing installation
Summary of Contents for DRH7
Page 1: ...Digital ORP Sensor User Manual Model DRH7 Version 1 0 Daruifuno ...
Page 2: ......
Page 4: ......
Page 15: ......
Page 16: ...Delfino Environmental Technology Co Ltd www daruifuno com info daruifuno com ...