9
DEHOUST GMBH – GUTENBERGSTR. 5-7 – D-69181 LEIMEN – www.dehoust.com
Figure 4: Connection of the drinking water feed
5.3.2.
Process water line
Connect and seal the process water pressure line with the brass threaded connection (see 3.2) on the middle tank cover of the
break tank system
.
Connect the pressure line in de-energised state. There should not be any forces applied to the brass threaded
connection of the system. We recommend installing a shut-off valve and a detachable screw.
Figure 5: Connection of the process water line
5.4.
Emergency overflow connection
Connect the emergency overflow connection DN 70 (see 3.2) of the break tank system with the channel interface or a suitable
pump system. For this purpose, insert a DN 70 HT pipe of approx. 2-3 cm into the provided DN 70 green lip seal and install the
pipe according to the intended connection.
This overflow becomes active if the mechanical float valve of the drinking water feed line has a malfunction and the water rises
over the maximum fill level in the storage tank.
Connection of the mechanical
float valve to the drinking
water line