background image

 

 

 

 

 

 

01.01.2022

 

ASSEMBLY AND OPERATING MANUAL DEGER D25H, D60H, D80 and D100

 

Page 34 

 

10

 

 Declaration of obligation on liability for material 
defects

 

 

 

You have purchased a product that was subject to meticulous examination before it was delivered. Nevertheless, in the event that the 
DEGER tracking system supplied by us does display any defects then the scope of our liability for defects shall be as follows: 

 

A)  Liability for Defects

 

 

DEGERenergie GmbH & Co. KG grants a 2-year period for new systems/spare parts and 1-year for refurbished parts for defects to be 
asserted. This period starts with the delivery from the factory. DEGERenergie GmbH & Co. KG offers to replace the defective parts free 
of charge where any justified claims are received in this period.  

For the entire steel construction DEGERenergie GmbH & Co. KG offers extended liability for defects of 10 years against rust-through 
starting with the delivery from the factory. A 10-year warranty against corrosion is only guaranteed if a regular repair of the grate areas 
has  been  carried  out.  Where  a  defect  arises  the  contract  partner  of  DEGERenergie  GmbH  &  Co.  KG  is  obligated  to  inform 
DEGERenergie  GmbH  &  Co.  KG  immediately  by  sending  a  fault  report  (part  of  the  assembly  instructions)  by  e-mail  to: 

[email protected]

, stating the system serial number. 

 

B)  Proof

 

 

A fault report completed in full and stating the system and/or serial number of the defect  part is considered as proof with any claim for 
defects  (see  poit  “D)  Liability  for  Defects”).  The  defective  assembly  part  must  be  sent  to  DEGERenergie  GmbH  &  Co.  KG  for 
examination with a copy of the fault report. The type plate and the serial number on the equipment must be completely legible. There 
must  be  no  changes  present  or  made  to  the  original  delivery  condition  and  no  mechanical  damage  (cut  cables,  damaged  terminals, 
etc.). DEGERenergie GmbH & Co. KG will decide on its liability for defects following an examination of the assembly part sent. 

 

 

C)  Terms and Conditions

 

 

Spare  parts  that  are  shipped  before  defective  parts  are  received,  must  be  returned  to  DEGERenergie  GmbH  &  Co.  KG  within  20 
working  days.  Customer  carries  the  transport  costs  of  the  defective  and  the  new  parts.The  return  shipment  has  to  be  adequate  post-
paid. Freight collect packets will not be accepted. Replaced spare parts become the property of DEGER. In the event that the return has 
not taken place in the described time frame, all parts will be inevitably and irrevocably due for payment. 

 

Where there is a defect in the contractual item and DEGERenergie GmbH & Co. KG is responsible for this, then DEGERenergie GmbH 
& Co. KG shall be under an obligation to repair the damaged part or replace it with a spare part, unless DEGERenergie GmbH & Co. 
KG is entitled to refuse the supplementary performance on account of statutory regulations. 

 

 

Any replacement of individual parts within the defect period does not give rise to an extension to the validity period neither for the liability 
for defects in the system nor for the replaced spare part. 

 

The contract partner of DEGERenergie GmbH & Co. KG must grant the latter a reasonable period for the supplementary performance. 
DEGER tracking systems are only allowed to be operated in association with DEGER wind guard which brings the solar module area 
into  the  horizontal  position  in  the  event  of  a  storm.  This  must  be  assembled  in  accordance  with  the  specifications  in  the  assembly 
instructions. It must be ensured that this wind guard is available and fully functional at all times. 

 

D)  Liability Disclaimer

 

 

DEGERenergie  GmbH  &  Co.  KG  is  not  liable  for  any  damage  that  arises  as  a  consequence  of  improper  operation  by  the  contract 
partner, in particular if the module area is dimensioned too generously. The maximum module area that can be installed can be seen in 
the module layout plan sent with the order confirmation from DEGERenergie GmbH & Co. KG. 
Where permissible under the law then DEGERenergie GmbH & Co. KG shall not be liable for material damage and financial loss (e.g. 
lost buyback price, reduction of feed-in tariffs etc.) which result from a defect in the tracking system.  

 

Open area systems: 

Under the provision under "Liability for Defects", DEGERenergie GmbH & Co. KG is not liable for any extra costs 

(e.g. use of crane, skylift, etc.) that arise from using higher masts than the standard version. 

 

Building integration:

 Under the provision under "Liability for Defects", DEGERenergie GmbH & Co. KG is not liable in particular for any 

extra costs (e.g. use of crane, skylift, etc.) that arise from erecting masts on buildings. 

 

In addition DEGERenergie GmbH & Co. KG is not liable for: 
- defects that arise from unintended use 
- defects that arise from the use of third-party components, e.g. the mounting profile, electronic parts 
- defects that arise through changes to the mechanics and/or electronics 
- defects that arise on account of a force majeure event (lightning strikes, surges, severe storm, fire, etc.) 
- defects that arise through the module area being too large in derogation from the module layout plan (depending on the installation 

location, installation height, etc.) 

- defects that arise through interventions, changes or repair attempts that have been made 
- defects that arise through a failure to follow the information in the assembly and operating manual. 

 

In all other respects our General Terms and Conditions for Deliveries and Services shall additionally apply, version: 01. September 2014 

 

 

DEGERenergie GmbH & Co. KG 

 

 

The German version of this declaration is legally binding. 

Industriestrasse 70   

 

 

 

Translations into other languages serve only for a better comprehension.

 

D - 72160 Horb a.N. 

www.DEGER.biz

 

 

 
_____________________ 

 

Hünkar Korkmaz, CEO 
Date: 01.01.2021 

Summary of Contents for D25H

Page 1: ...DEGER D25H DEGER D60H DEGER D80 DEGER D100 ASSEMBLY AND OPERATING MANUAL ...

Page 2: ...ight Laws and Treaties Any unauthorized reprint or use of this material is prohibited No part of this manual including drawings and technical descriptions may be reproduced or transmitted in any form or by any means electronic or mechanical including photocopying recording or by any information storage and retrieval system without express written permission from the author publisher We reserve the...

Page 3: ...ompanying documentation 12 2 4 3 Optional accessories 12 2 5 Performances to be rendered by the Customer 12 2 5 1 Material to be provided by the customer 12 2 5 2 Machines to be provided by the customer 13 2 6 Technical data 13 2 6 1 Climatic conditions according to DIN EN 50178 1998 04 13 2 6 2 Permitted tolerances 13 3 Unloading and intermediate storage 14 3 1 Unloading from truck 14 3 1 1 Notes...

Page 4: ...ction diagram 31 7 2 Overview 32 8 Commissioning 33 9 Inspection for free movement 33 9 1 Initiate the inspection for free movement 33 9 2 Scope of the inspection for free movement 33 10 Declaration of obligation on liability for material defects 34 11 Optional accessories 35 11 1 Holding plate for junction box on mast 35 11 2 Holding device for inverter on the rotating head 35 12 Cleaning and mai...

Page 5: ...Energy Converter 6 part of control EL Elevation inclination angle EMO Elevation drive motor MLD Maximum Light Detection MLD control EC 6 CCB MLD sensors wind monitor snow sensor OSHA Occupational Safety and Health Administration PB Power Box part of control PPE Personal Protective Equipment SW Spanner Width wrench size UPS Uninterruptible Power Supply ...

Page 6: ...rance obligation of the module surface from snow For the DEGER systems D60H and D25H the max permissible load is 35 kg m this corresponds with approx 8 cm wet snow and approx 15 cm powder snow For DEGER systems D80 and D100 the module surface must be cleared if the load reaches and exceeds 10 kg m this corresponds with approx 2 cm wet snow and approx 4 cm powder snow DEGER recommends an Uninterrup...

Page 7: ...or action Instruction for action Results Results of an action are highlighted with a double arrow Result 1 5 2 Notes on safety The following safety notes are used in this document ______________________________________________________________________________________ DANGER Direct endangerment with high risk failure to comply will lead to fatal or severe physical injuries __________________________...

Page 8: ...2 3 1 Intended use of the DEGER systems DEGER systems have been designed for the tracking of photovoltaic modules They are not intended for any other use e g concentrated modules use of mirrors or other purposes DEGER systems can be used for private or commercial applications They are suitable for outdoor installation and building integration 2 3 2 Personal protective equipment The customer must p...

Page 9: ...the reinforcement of foundations Secure use of hoisting gear and lifting tackle Preparation of foundation DEGER Steel foundation Expert personnel Secure use of tools Secure use of hoisting gear and lifting tackle Product specific knowledge Expert personnel Suitable expert personnel with basic technical education must be made available for the mechanical assembly and disassemblyof the system Secure...

Page 10: ...SEMBLY AND OPERATING MANUAL DEGER D25H D60H D80 and D100 Page 10 2 4 Scope of delivery 2 4 1 Scope of delivery of the DEGER systems 7 6 5 4 8 9 10 27 22 23 24 11 12 13 1 2 3 21 22 23 24 15 16 17 18 19 20 12 14 19 20 ...

Page 11: ...closed with EC 6 alle Systeme 20 6300025 2 Washer DIN125 A9 0 01 Enclosed with EC 6 alle Systeme 21 4100081 1 Elevation drive T7 80x90x1610 21 all systems 22 6100136 1 Bolt DIN931 10 9 M20x110 0 04 Enclosed with elevation drive all systems 23 6300026 2 Washer DIN125 A21 0 03 Enclosed with elevation drive all systems 24 6200032 1 Hexagon nut DIN985 M20 0 07 Enclosed with elevation drive all systems...

Page 12: ...00x650 14 59 1900014 1 Holding device for inverter 900x470 15 60 1900015 1 Holding device for inverter 600x470 10 61 1990050 1 Alignment Tool 100x105x125 1 Article number dimensions and weight depend on the size of the delivered article Article number dimensions and weight can be found in the delivery note Up to 200 plants can be operated with one Central Control Box and one snow sensor 2 5 Perfor...

Page 13: ...AC 50 60 Hz Input rated current 0 3 A Output voltage 24VDC Max continuous output current 2 5A Power nominal control mode 1 Watt With running drive 24V 0 4A 14 Watt 24V 0 4A 15 Watt 24V 0 6A 15 Watt 24V 0 7A 18 Watt Internal consumption per year approx 12 kWh 14 kWh 14 kWh 16 kWh Drive AZ Gear in drive head Rotating speed AZ 30 min Drive EL 800 mm lift Rotating speed EL 13 min Sound level less than...

Page 14: ...ane can be used for unloading at the site and only be operated by trained personnel who have been specially instructed for this purpose 3 1 2 Dimensions and weights The weight of the individual packages can be found in the Loading list which is attached to the freight documents The centre of gravity and the lifting points for unloading are identified directly on the package For the weights of indi...

Page 15: ...____ 3 Assemble the aluminium profiles to the base frame ______________________________________________________________________________________ 4 Mount the rotating head to the mast ______________________________________________________________________________________ 5 Assemble the elevation drive EMO ______________________________________________________________________________________ 6 Mount t...

Page 16: ... the DEGER systems D60H to walls which are suitable for this purpose The confirmation of a structural calculation must be available before assembly work is started 5 1 3 Concrete foundation A qualified professional must be commissioned with creating the foundation We recommend having the foundation reinforcement approved by a qualified engineer or technician before concreting The necessary bearing...

Page 17: ...ation Option 2 3 Prepare a formwork around the bent bar steel reinforcement cage in the center The structural integrity of the formwork should absorb the pressure of the surrounding concrete once pour out Pour out with concrete C25 30 without the area for the bent bar steel in the center compact the foundation and allow the concrete to harden for at least two days 4 Remove formwork in the center I...

Page 18: ...down they can cause severe or even fatal injuries The tightening strap for fixing the toggle lever to the rotating head must only be removed after the elevation drive has been assembled WARNING Danger of injury due to of improperly performed assembly work Improperly executed assembly work can lead to severe injuries and considerable material damage Ensure sufficient assembly space before starting ...

Page 19: ...e rotating head must not be removed otherwise there is a danger of damaging the AZ drive Place the rotating head with the pallet on level ground 2 Place appropriate support structure under the corner points of the cross bars as seen in exemplary picture right The structure should be levelled to a uniform level of 1 cm 3 Fasten both cross bars with four bolts M16x70 washers and self locking nuts M1...

Page 20: ...uter bolt connections Insert the opposite end through the slot in the U section and fix loosely with washer and two nuts M12 6 Fasten the L Profile to longitudinal beams with two bolt M12x40 four washers and two self locking nut M12 each Then tie U sections to L Profile with one bolt M12x40 two washers and one self locking nut M12 each Tightening torque 84 Nm 7 On the D100 keep turning the nut M12...

Page 21: ...cts caused by failing to comply with the module configuration layout are not covered under warranty ATTENTION No aluminium profiles must be mounted in the middle area of the central slewing bolt A distance of at least 600 mm from the middle must be free of aluminium profiles Failure to comply may cause damage to DEGER systems or modules The aluminium profiles project from the base frame at top and...

Page 22: ... the longitudinal beams from the outside Tightening torque 35 Nm DEGER systems D25H and D60H The aluminium profiles are fastened with two MTH clamp to each of the longitudinal beams from inside and outside Tightening torque 35 Nm 6 3 Further preparation 1 Take the MLD control out of the rotating head and fasten it temporarily to the front of the rotating head 2 Apply the sticker Access for unautho...

Page 23: ...ng tackle of 6m length and a load bearing capacity of 1500 kg under an angle of 45 must be used 2 Carefully lower the rotating head on to the mast flange The gear must not be exposed to any hard impact 3 The rotating head must be aligned in such a way that the receptacle for EMO points 20 to the North 4 Fasten the rotating head by turning 18 bolts M16x75 with one washer each into the mast flange f...

Page 24: ...e with the bore in the toggle lever of the central tube 3 Fasten the EMO to the toggle lever with bolt M20x110 washers and nut M20 The cable outlet on the EMO points towards the rotating head Tightening torque 200 Nm 4 Remove the tightening strap and the square timber from the toggle lever 5 Remove the lifting tackle from the base frame 6 6 Assembly of energy converter 6 EC 6 A locking plate is bo...

Page 25: ...clarified with the module manufacturer beforehand Please note Please check whether aluminium profiles have been mounted as per 6 2 in these instructions equal projection on both sides Arrange the modules symmetrically to the centre of gravity middle of base frame The centre of gravity of the module surface is not the centre of gravity of the mast but is above the slewing bolt Detail Centre of grav...

Page 26: ...ication Permitted maximum value for this bolt is 8Nm DEGER doesn t assume any responsibility for this value Optional WEEB DPR for bonding and grounding Please contact DEGER for further information 6 7 2 Clamping at end of module surface ATTENTION The permissible fastening and the area of fastening of the modules must be comply with the module manufacturer specification Permitted maximum value for ...

Page 27: ...tighten four bolts from the rear gearbox cover and lay them safely to the side 5 Carefully cut the cable straps on the coiled up wiring loom 6 Push the wiring loom down through the mast and through the opening in the mast Ø50 mm to the outside Local regulations have to be followed and additional measures should be taken if necessary 6 9 Boomerang The boomerang has the function of limiting the AZ s...

Page 28: ...ove Tightening torque 24 Nm 4 Fasten the rear gearbox cover again with the four bolts M8x12 and one washer each Tightening torque 24 Nm 6 11 Connecting the elevation drive 1 Pull the cables for EMO through the cable clamps on the rotating head Before fastening the cable clamps make sure the cable between EMO and clamp is long enough to compensate the movement of the EMO 2 Push the cable down throu...

Page 29: ...outing of cables 1 If necessary replace the plugs with the supplied perforated inserts 2 Route all cables downwards through the mast and through the bore Ø 50 mm at half mast height to the outside 3 Loosely fasten all cables with a cable strap at both bores 4 Fasten the front gearbox cover again with the two bolts M8x12 and one washer each Tightening torque 24 Nm Wind sensor Snow sensor Communicat...

Page 30: ... module frame or the aluminium section with bolt M6x16 Tightening torque 8 Nm 2 Mount the MLD sensor labelled Elevation to the SIDE of the solar module surface approx in medium height middle to upper edge viewed from the front on the left side of the solar module surface Fasten the mounting bracket of the MLD sensor to the module frame or the aluminium section with bolt M6x16 3 Align the MLD senso...

Page 31: ...ram ATTENTION Connection plans as well as further details on the control including all individual components can be found in the assembly manual MLD Control EC 6 with CCB Optional sunlight sensor EC 6 with MLD sensors CCB with joystick Standard Wind monitor Optional Snow Sensor Pin 1 2 3 4 Pin 16 17 18 19 Cable br bl bk Pin 20 ...

Page 32: ...evaluation unit CCB Central Control Box Grid connection Junction box Snow sensor Drive Azimuth Drive Elevation EL Anemometer EC 6 Energy converter MLD sensor East West AZ MLD sensor Elevation EL Building Signal lines Electric power supply for EC 6 Cable can also be used for the inverter if designed accordingly Cable routing planned inside the mast ...

Page 33: ... free movement 9 1 Initiate the inspection for free movement In order to make sure that the mechanics of the DEGER systems are freely moveable and that all cables are long enough and the limit switches turn off the motors one must move through the complete distance of the EMO and azimuth drive ATTENTION If several DEGER systems are connected to one CCB the inspection for free movement must be perf...

Page 34: ...tled to refuse the supplementary performance on account of statutory regulations Any replacement of individual parts within the defect period does not give rise to an extension to the validity period neither for the liability for defects in the system nor for the replaced spare part The contract partner of DEGERenergie GmbH Co KG must grant the latter a reasonable period for the supplementary perf...

Page 35: ...g and slewing range of the DEGER systems 11 2 Holding device for inverter on the rotating head ATTENTION Please make sure the inverter does not project from the holding device for inverter into the rotating and slewing range of the DEGER systems Further information concerning the rotation and slewing range can be found in the module configuration layout 1 Fasten the bracket with four bolts 10x20 a...

Page 36: ...signed for lifetimes in excess of 25 years They have been designed in such a way that only minor service and repair work is required However to achieve long lasting operation it is recommended to perform the following work in regular intervals Annually Check all bolts for secure fit and if necessary retighten with the tightening torque specified in the assembly instructions Check of the operation ...

Page 37: ...sts are available from DEGERenergie GmbH Co KG They are also available for downloading from the website www DEGER biz in the dealer section 13 2 Contact information for DEGER Headquarters DEGERenergie GmbH Co KG Industriestr 70 D 72160 Horb am Neckar Germany Tel 49 0 7451 53914 0 Fax 49 0 7451 53914 10 E mail service DEGERenergie com ...

Page 38: ...life caused by electric shock when contacting live components Before starting work switch off the electric power supply and secure it against accidental switching on If it is absolutely essential to conduct a test with a live power supply then injury to persons or property must be prevented by taking the appropriate steps to rule out such an event occurring ...

Page 39: ...Control via wind monitor moves to horizontal position Measuring values on energy converter Voltage input Terminal L N V LED MOTOR POWER OK LED green LED off LED SENSOR POWER OK LED green LED off LED EL MOTOR Terminal 1 2 LED green LED red LED AZ MOTOR Terminal 3 4 LED green LED red LED EL SENS OUT Terminal 11 12 LED green LED red LED AZ SENS OUT Terminal 13 14 LED green LED red Signal on SAVE POS ...

Page 40: ...rial environments EN 61000 6 3 2007 A1 2011 Electromagnetic compatibility EMC part 6 3 generic standards emission standard for residential commercial and light industrial environments EN 61000 6 4 2007 A1 2011 Electromagnetic compatibility EMC Part 6 4 generic standards emission standard for industrial environments EN 55011 2016 A11 2020 Electromagnetic compatibility EMC testing standards testing ...

Page 41: ...sassembly work Improperly executed disassembly work can lead to severe injuries and considerable material damage Ensure sufficient assembly space before starting work Ensure correct disassembly Have disassembly work only performed by persons who have the qualifications specified in the individual chapters of the assembly instructions Take care of sharp edged parts Wear hard hat safety gloves and s...

Page 42: ...s Wear safety gloves After disassembly the parts may be recycled or must be disposed of according to national and local regulations The parts must only be disposed of by instructed professionals For transportation by truck one must strictly comply with the loading and transport regulations specified in national and local regulations Corresponding information is contained in the transport regulatio...

Page 43: ...49 0 7451 53914 10 www DEGER biz info DEGERenergie com Registered Head Office Horb am Neckar Germany Registry Court of Companies Stuttgart Germany Country Court HRB 730079 VAT No DE 295812054 Partner Company DE Verwaltungs GmbH Industriestraße 70 72160 Horb Germany Registry Court of Companies Stuttgart Germany Country Court HRA 749359 CEO Hünkar Korkmaz Registered Head Office Horb am Neckar German...

Reviews: