4.2 Arrival and Setup
This section details the steps required to use the RMU-1000 ACC during an emergency. The
following instructions are for a two-rescuer scenario.
Note:
To minimize CPR interruptions and to most effectively use the RMU-1000, two
rescuers are recommended.
Note:
Providing manual chest compressions takes precedence over setting up and
initiating use of the RMU-1000.
The following instructions are for a two-rescuer scenario.
STEP 1)
Confi rm that the patient is unresponsive and not breathing. Remove clothing from the
patient’s chest and begin manual CPR immediately.
STEP 2)
Open the Carrying Case and remove the ACC Backboard.
STEP 3)
Place the Backboard under patient just below armpits. Lift patient body slightly and
slide the Backboard under patient or roll patient from side to side, as needed. The center of
the Backboard should be in line with the nipple line of the patient. Accurate placement of the
Backboard will help with the alignment step later.
STEP 4)
Resume manual CPR.
4.
Using the
RMU-1
0
0
0 A
CC
RAC-E1510EN-DN
31
Summary of Contents for RMU-1000
Page 2: ......
Page 6: ...RAC E1510EN DN 6...
Page 8: ...1 2 The Defibtech RMU 1000 ACC 7 6 3 4 5 1 2 13 12 14 15 8 9 10 11 RAC E1510EN DN 8...
Page 12: ...RAC E1510EN DN 12...
Page 28: ...RAC E1510EN DN 28...
Page 50: ...RAC E1510EN DN 50...
Page 54: ...RAC E1510EN DN 54...
Page 64: ...RAC E1510EN DN 64...