248-624-7710 / dedoes.com
Alliance A7 Assembly Instruc�ons
P1615 RV.5 2022-05-20
Step 2 – Remove three screws from each side of the base unit.
Leave (1) screw secured (the second screw from the front of the base unit)
Step 1 – Remove the two screws from each side of the unit.
Step 2 – Install unit so the moun�ng holes in the side panels align with the threaded inserts in the connector brackets.
Step 3 – Re-install and �ghten the two screws in each side of the unit.
Step 4 – Insert the square sha�. Ensure it is inserted all the way down and engaged with the 52mm drive gear in the unit below.
(See illustra�on below).
Step 5 – Install the sha� guard over the sha�.
B. Installa�on of the Addi�onal Units
Note: To help determine which unit should be installed in which loca�on please review the instruc�on on Page 2 & 3.
The Alliance A7 System can be assembled in a variety of configura�ons. Follows these rules to assist in assembly.
Rule 1: One Liter units should be installed above the larger Four Liter units.
Rule 2: Heated units should always be installed above non heated units.
Rule 3: Storage units should always be installed above mixing units.
Upper Drive Sha�
52mm Drive Gear
Side
View
Sha� Guard
Sha� Guard
Lower Drive Sha�
Base
Unit
Connector
Bracket
Connector
Bracket
Back of Machine
Screws
Moun�ng
Holes