4.6
Solar collector temperature sensor ..................35
4.7
Passing Pipes and Cable through the
Roof ......................................................................36
4.8
Hydraulic connections .......................................37
4.8.1
Connection dimensions .........................................37
4.8.2
Connecting ............................................................37
4.8.3
Pipe insulation .......................................................38
4.9
Filling the system ...............................................38
5
Commissioning ........................................................................................40
5.1
Check points before commissioning ................40
5.2
Commissioning ...................................................40
6
Checking and maintenance .....................................................................41
6.1
General instructions ...........................................41
7
Warranty ....................................................................................................42
7.1
General ................................................................42
7.2
Warranty terms ...................................................42
Contents
NEO 2.1 / SUN 211
2
05/10/09 - 300020210-001-B
Summary of Contents for NEO 2.1
Page 4: ...3 05 10 09 300020210 001 B ...
Page 20: ...M001777 A I M001778 A 4 Installation NEO 2 1 SUN 211 19 05 10 09 300020210 001 B ...
Page 26: ...3 4 5 M001766 A 4 Installation NEO 2 1 SUN 211 25 05 10 09 300020210 001 B ...
Page 29: ...n Solar Panel Connection M001769 A NEO 2 1 SUN 211 4 Installation 05 10 09 300020210 001 B 28 ...
Page 32: ...2 3 M001784 A 4 Installation NEO 2 1 SUN 211 31 05 10 09 300020210 001 B ...
Page 35: ...n Solar Panel Connection M001787 A NEO 2 1 SUN 211 4 Installation 05 10 09 300020210 001 B 34 ...