![DeDietrich Elitec DTG 1304 Eco.NOx/V Technical Instructions Download Page 19](http://html1.mh-extra.com/html/dedietrich/elitec-dtg-1304-eco-nox-v/elitec-dtg-1304-eco-nox-v_technical-instructions_2462437019.webp)
19
23/06/05 - 300002940-001B
DTG 1300 Eco.NOx/V
4 Setting the injector pressure
`
Connect a manometer to the pressure socket located on the
manifold.
`
Remove the protective cover
C
on the regulator by unscrewing
it using a screwdriver.
`
Set the pressure on the injectors by moving the gas regulator on
the valve.
5 Pressure settings and calibrated injector markings
Flows are stated at 15°C - 1013 mbar.
Setting the start up pressure
Start up pressure may be set if necessary using a flat screwdriver,
after the protection has been removed
E
.
Start up pressure is set in the factory on minimum. If it is necessary
to optimise heater start up, it may be set on another value between
0º and 270º.
Gas valve opening diagram
Manifold pressure (mbar)
Natural gas H
15
Natural gas L
12,1
Propane
29
Number of parts in the heater
4
5
6
Nozzle H/E
210B
210B
210B
Nozzle L/LL
245B
245B
245B
Nozzle Propane
140A
140A
140A
Manifold pressure H/E
mbar
15
15
15
Manifold pressure L/LL
mbar
12,1
12,1
12,1
Manifold pressure
Propane
mbar
29
29
29
Gas flow rate H/E
m
3
/h
2,13
2,83
3,52
Gas flow rate L/LL
m
3
/h
2,47
3,29
4,10
Flow rate Propane
Kg/h
1,56
2,07
2,59
E
Protective hood
F
Ionisation probe connection
G
Ignition electrode connection
Downstream pressure
Time (seconds)
Summary of Contents for Elitec DTG 1304 Eco.NOx/V
Page 1: ...DTG 1300 Eco NOx V Gas fired boilers English 23 06 05 Elitec Technical instructions...
Page 31: ...31 23 06 05 300002940 001B DTG 1300 Eco NOx V Gas line Cladding...
Page 32: ...32 DTG 1300 Eco NOx V 23 06 05 300002940 001B Linking kit...
Page 36: ...36 DTG 1300 Eco NOx V 23 06 05 300002940 001B...
Page 37: ...DTG 1300 Eco NOx V 23 06 05 300002940 001B...
Page 38: ...DTG 1300 Eco NOx V 23 06 05 300002940 001B...