Page: 81 of 102
24.
Appendix IV.
24.1 Operator Maintenance Quick Checklist
Quick Checklist
Done
Intervention
needed
Partly
Value
1.
Check the outward appearance for
leakages.
2.
Check out the cables for wear.
3.
The desiccator humidity [%rH]:
4.
Switch the stream.
5.
Flush the Measuring Cell with oil free
water.
6.
Display shows 0 to 2 ppm. If not, follow
up with the steps 8- 15.
7.
Stop any water flow.
(Shut off the instrument air.)
8.
Check the O-Rings for wear.
9.
Check the wiper piston.
10.
Clean the Measuring Cell.
11.
Screw back Cell Cap, MCU, or Auto Clean
tight in.
12.
Flush the Measuring Cell with oil free
water.
13.
Display shows 0 to 2 ppm. If not, use the
Servicing and Cleaning Appendix.
14.
Check air pipe connection of air supply.
15.
Turn on the sample water flow.
16.
Perform a “System Test” for checking
alarms.
17.
Check data logger/ clock.
Checked by:
Date:
Signature:
Summary of Contents for OMD-2008
Page 28: ...Page 27 of 102 5 5 Cabling OMD 2008 EV Figure 9 Bottom View OMD 2008 EV ...
Page 84: ...Page 83 of 102 ...
Page 85: ...Page 84 of 102 ...
Page 86: ...Page 85 of 102 ...
Page 87: ...Page 86 of 102 ...
Page 88: ...Page 87 of 102 ...
Page 89: ...Page 88 of 102 ...
Page 90: ...Page 89 of 102 ...
Page 91: ...Page 90 of 102 ...
Page 92: ...Page 91 of 102 ...
Page 93: ...Page 92 of 102 ...
Page 94: ...Page 93 of 102 ...
Page 95: ...Page 94 of 102 ...