N
Networks
connecting to, 1–32
Ethernet, 1–32
O
OCP
See Operator control panel
Operating system
boot failures, reporting, 4–28
booting, 1–25
OpenVMS booting, 1–25
OSF/1 booting, 1–25
preboot tasks, 1–23
problems, troubleshooting, 4–28
supported, 1–3, 1–25
Windows NT booting, 1–26
Operating systems
supported, 1–3
Operator control panel
DC On/Off button, 2–2
display, interpreting, 4–12
Halt button, 2–2, 2–3
power-up/diagnostic display, 2–2
Reset button, 2–4
Options
adding, 3–2
configuring with ECU, 3–29
from non-Digital vendors, 3–2
installing, 3–2
supported, 3–4
system bus, 3–18
P
Panels
left, 2–7
removal, 2–5
right, 2–7
PCI, 1–4
PCI bus, 1–3
defined, 3–37
location, 2–13, 3–18
troubleshooting, 4–25
Peripheral devices, connecting, 1–34
Phone numbers
customer support, 4–7
Power cords
order numbers, 1–9
Power problems
troubleshooting, 4–10
Power requirements, 1–6, 1–8
Power supplies, 1–8
Power supply
accessing, 2–7
configurations, 3–47
redundant, configuring, 3–47
Power supply configurations, 3–49
Power-down procedure, 1–27
for extended power-down, 1–29
turning off DC power, 1–28
Power-up display
interpreting, 4–12
Power-up procedure, 1–16
Power-up sequence
EISA bus failures, 4–23
mass storage failures, 4–20
PCI failures, 4–25
Power-up/diagnostic display, 1–19, 2–2
Printer, connecting, 1–34
Problems
See also Troubleshooting
determining type, 4–5
identifying, 4–1, 4–4
reporting, 4–6
Q
QIC tape drive
operating, 1–52
Index–4
Summary of Contents for AlphaServer 2100
Page 4: ......
Page 12: ......
Page 83: ...Accessories Figure 2 6 Accessories 1 2 3 4 5 6 7 8 M A 0 4 5 5 9 3 9 Hardware Components 2 15...
Page 84: ......
Page 129: ...SCSI Buses Figure 3 9 Installing Hard Disk Drives M A 0 6 0 6 9 3 Options and Upgrades 3 45...
Page 134: ......
Page 164: ......
Page 190: ......