
DECATHLON SERIES GAS FRYERS
CHAPTER 1: SERVICE PROCEDURES
1-25
1.7.8 Replacing the Frypot
(cont.)
18.
If fryer is equipped with a front drain manifold,
disconnect manifold at slip-nut fitting and
remove.
19.
a.
1.5” drains:
-
Remove drain extension from elbow on
drain valve. Drain extensions will vary in
shape and size according to fryer model.
-
Set aside for reassembly.
b.
3” drains:
Only tubes directly blocking the
frypot being replaced need to be removed.
-
Remove the nuts holding the drain valve
straps onto the drain tube studs.
-
Disconnect the Teflon tube at the back of
the center dump tube piece.
-
Disconnect any other components attached
to the tubes.
-
Remove the clamps and rubber boots
holding the drain sections together by
loosening the nuts on each clamp.
-
Carefully remove the tubes by pulling
down at an angle, straight out of the drain
valves.
-
Set aside for reassembly.
Removing 3” drain tubes. (Step 19.B)
Removing 1.5” drain extension. (Step 19.A)
On front drain manifolds, disconnect the slip-nut
fitting (arrow) to remove.
Summary of Contents for CFD
Page 47: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 42 Decathlon Dual Vat ...
Page 48: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 43 Thermatron 24V ...
Page 49: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 44 Thermatron 120V ...
Page 50: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 45 Transformer Box ...
Page 52: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 47 Dean Oil Return Wiring ...
Page 55: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 50 Basket Lift with Timer 805 1411 ...
Page 56: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 51 CM4 S with Constant Pilot ...
Page 57: ...DECATHLON SERIES GAS FRYERS CHAPTER 1 SERVICE PROCEDURES 1 52 Chili s Wiring Diagram ...