6.2 Installation Technical Requirements 

6.2.1 When installing the chamber, the flange axis of the chamber side must be perpendicular to the 
horizontal plane, and the verticality is within 3 °. 6.2.2 Ensure that the level of the equipment lead 
pipe is within 3 °. 
6.2.2 Ensure that there are no ferromagnetic particles in the medium that could be attracted to the 
controller magnetic rod and affect switching performance. 
6.2.4  The  fluctuation  frequency  of  the  measured  medium's  level  cannot  be  too  large,  and  the 
fluctuation range can’t exceed its permissible action limit. 

6.3 Installation Procedure 

6.3.1 Place the gasket on the flange sealing surface of the container. 
6.3.2 Align the switch flange with the container flange, install flange bolts and nuts, and ensure that 
the flange gasket is installed correctly. 

7.Debugging 

7.1 Preparation for Commissioning 

7.1.1 Debugging tools: Multimeter 

7.2 Electrical Wiring 

7.2.1 Wiring Cable Preparation:The wiring cable shall be outer diameter Ф10mm five-core rubber 
sleeve soft wire or rubber cable, one of which is inner ground wire. The other four cores are for a 
pair  of  normally  open  and  normally  closed  contact  lines  (using  two  of them), or  for  two  pairs  of 
normally open and normally closed contacts wirings. 
 
7.2.2Wiring Procedure 

1. Remove the enclosure cover. 

2. Wiring according to the wiring diagram, please note that the  high-alarm and low-alarm switch 
action  is  reversed,  be  sure  to  follow  the  wiring  diagram  (see  Figure  5)  to  connect  to  the  correct 
terminal. For SPDT form, high report connect a pair of normally open point - common terminal (see 
Figure 5-1), low report connect a pair of normally closed point - common terminal. 
(See  Figure  5-2),  for  DTDP  form,  the  high  report  is  connected  to  two  pairs  of  normally  open 
points-public end (see Figure 5-3), and the low report is connected to two pairs of normally closed 
points-public end (see Figure 5-4). 
 

Summary of Contents for UTK

Page 1: ...1 11 WWW DDTOP COM UTK DISPLACER LEVEL SWITCH Operation Manual UTK DT JS 1012 2018 A...

Page 2: ...ut prior notice Quality Assurance Dandong Top Electronics Instrument Group Co Ltd guarantees that all glass plate level gauge have no defects in materials and manufacturing processes within one year f...

Page 3: ...3 Technical Characteristics 7 3 1 Main Performance 7 3 2 Main Parameters 7 4 Dimensional Outline Drawing Figure 2 7 5 Unpacking and Inspection 8 5 1 Unpacking Inspection Notice 8 Figure 4 Sample Name...

Page 4: ...ment in intrinsically safe or non flammable site operating procedures 1 2 Process leaks can cause serious injury or death Care should be taken to lift the transmitter If the process seal is damaged th...

Page 5: ...0 Spring assembly 11 Displacer 12 Wire rope 2 2 Operating Principle 2 21 Classification of Displacer Level Switch The Displacer Level Switch is divided into ball float type and displacer type based on...

Page 6: ...an be controlled and given an alarm 2 1 3 Displacer Type Operating Principle With the displacer as the sensing element the displacer hangs on a spring through the suspension rod When the level is rais...

Page 7: ...rmance 3 1 1 Has passed the national explosion proof certification certification mark Intrinsically safe Ex ia CT1 T5 T6 Explosion isolation Ex d CT1 T5 T6 3 1 2 Product Standard Q AMM 004 Displacer L...

Page 8: ...Figure 4 is consistent with the information in the supply list 5 1 2 Check the quantity and material of each part against the packing list 5 1 3 Check the appearance of the instrument for defects dama...

Page 9: ...ation for Commissioning 7 1 1 Debugging tools Multimeter 7 2 Electrical Wiring 7 2 1 Wiring Cable Preparation The wiring cable shall be outer diameter 10mm five core rubber sleeve soft wire or rubber...

Page 10: ...with water If medium water it can t be debugged with water It can only be debugged with actual measuring medium 4 For medium water When calibrating with water the alarm position will be lower than the...

Page 11: ...ctual alarm position and specification 1 Process condition is not consistent with design condition The actual density or alarm setting value is inconsistent with the design value 2 On site heat tracin...

Reviews: