background image

     

 

 

2

 / 

11

 

 

WWW.DDTOP.COM 

Preface 

 

Thank you for choosing the products of Dandong Top Electronics Instrument (Group)Co.,Ltd. 
 
This  operation  manual  provides  you  with  important  information  on  installation,  connection  and 
commissioning  as  well  as  on  maintenance,  troubleshooting  and  storage.  Please  read  it  carefully 
before installation and commissioning and keep it as part of the product near the meter for easy 
reading. 
 
This manual can be downloaded by entering the version number at 

www.ddtop.com

 

 
如未遵照本说明书进行操作,则本仪表所提供的防护可能会被破坏。 
If the instructions are not followed, the protection provided by the meter may be destroyed. 
 
Trademark, Copyright and Restriction Instructions 
Dandong Top Electronics Instrument (Group) Co.,Ltd.®, Dandong Top Pump Co., Ltd.®, DDTOP® 
are registered trademarks of the company. 
 
The  performance  specifications  of  the  meter  are  effective  as  of  the  date  of  publication  and  are 
subject to change without notice. Dandong Top Electronics Instrument (Group)Co.,Ltd. reserves the 
right to modify the products described in this manual at any time without prior notice. 
 
Quality Assurance 
Dandong  Top  Electronics  Instrument  (Group)  Co.,Ltd.  guarantees  that  all  glass  plate  level  gauge 
have no defects in materials and manufacturing processes within one year from the date of delivery. 
 
During  the  warranty  period,  if  the  product  returns  with  quality  problems  and  the  claim  is 
determined  by  the  manufacturer  to  be  within  the  scope  of  warranty,  Dandong  Top  Electronics 
Instrument (Group) Co.,Ltd. is responsible for repair or replacement of the buyer (or owner) free of 
charge. 
 
Dandong  Top  Electronics  Instrument  (Group)  Co.,Ltd.  is  not  responsible  for  the  costs  caused  by 
improper use of equipment, labor claims, direct or subsequent damage and installation and use of 
equipment. In addition to the special written warranty certificate for certain products of Dandong 
Top Electronics Instrument (Group) Co.,Ltd., Dandong Top Electronics Instrument (Group) Co.,Ltd. 
does not provide any express or implied warranty. 
 
Quality 
Dandong  Top  Electronics  Instrument  (Group)  Co.,Ltd.  has  passed  the  ISO9001  quality  system 
certification. The whole process of product production is strictly in accordance with the scope of the 
quality system, providing the strongest guarantee for product and service quality. 

 

 

Summary of Contents for UTK

Page 1: ...1 11 WWW DDTOP COM UTK DISPLACER LEVEL SWITCH Operation Manual UTK DT JS 1012 2018 A...

Page 2: ...ut prior notice Quality Assurance Dandong Top Electronics Instrument Group Co Ltd guarantees that all glass plate level gauge have no defects in materials and manufacturing processes within one year f...

Page 3: ...3 Technical Characteristics 7 3 1 Main Performance 7 3 2 Main Parameters 7 4 Dimensional Outline Drawing Figure 2 7 5 Unpacking and Inspection 8 5 1 Unpacking Inspection Notice 8 Figure 4 Sample Name...

Page 4: ...ment in intrinsically safe or non flammable site operating procedures 1 2 Process leaks can cause serious injury or death Care should be taken to lift the transmitter If the process seal is damaged th...

Page 5: ...0 Spring assembly 11 Displacer 12 Wire rope 2 2 Operating Principle 2 21 Classification of Displacer Level Switch The Displacer Level Switch is divided into ball float type and displacer type based on...

Page 6: ...an be controlled and given an alarm 2 1 3 Displacer Type Operating Principle With the displacer as the sensing element the displacer hangs on a spring through the suspension rod When the level is rais...

Page 7: ...rmance 3 1 1 Has passed the national explosion proof certification certification mark Intrinsically safe Ex ia CT1 T5 T6 Explosion isolation Ex d CT1 T5 T6 3 1 2 Product Standard Q AMM 004 Displacer L...

Page 8: ...Figure 4 is consistent with the information in the supply list 5 1 2 Check the quantity and material of each part against the packing list 5 1 3 Check the appearance of the instrument for defects dama...

Page 9: ...ation for Commissioning 7 1 1 Debugging tools Multimeter 7 2 Electrical Wiring 7 2 1 Wiring Cable Preparation The wiring cable shall be outer diameter 10mm five core rubber sleeve soft wire or rubber...

Page 10: ...with water If medium water it can t be debugged with water It can only be debugged with actual measuring medium 4 For medium water When calibrating with water the alarm position will be lower than the...

Page 11: ...ctual alarm position and specification 1 Process condition is not consistent with design condition The actual density or alarm setting value is inconsistent with the design value 2 On site heat tracin...

Reviews: