background image

     

 

  13 / 16 

 

WWW.DDTOP.COM 

7.1 Completely close all valves on the level gauge (Valve 1 - 4); 
7.2 缓缓开启储罐与液位计之间的法兰阀(阀 1、阀 3); 
7.2 Slowly open the flange valve between the tank and the level gauge (Valve 1, Valve 3); 
7.3  缓缓开启液位计上部阀门(阀 2); 
7.3 Slowly open the upper valve of the level gauge (Valve 2); 
7.4 缓缓开启液面计下部阀门使介质流入液位计内(阀 4); 
7.4 Slowly open the lower valve of the level gauge to allow the medium to flow into the level gauge 
(Valve 4); 
7.5 完全开启液面计的上部阀门和下部阀门(阀 2、阀 4) 
7.5 Fully open the upper and lower valves of the gauge (Valve 2, Valve 4) 

8

故障分析与排除

 

8 Failure Analysis and Elimination 

 

故障现象 

原因分析 

排除方法 

液位计内无液位 

钢珠将阀口封住 

关闭阀门后缓慢的开启阀门,待压力平稳后将阀门

完全开启。 

 
 
 

Fault Phenomenon

 

Reason

 

Method of Exclusion

 

No liquid level in the level gauge

 

Steel ball seals the 
valve port 

Slowly open the valve after closing 
the valve, and fully open the valve 
after the pressure is stable

 

 

9

维修

   

9 Maintenance 

9.1

警告

 

9.1 Warning 

在拆卸前应注意危险的过程条件,如:容器内的压力、高温、腐蚀性的或有毒的介质等。 
Attention should be paid to hazardous process conditions, such as pressure inside the vessel, high 

Summary of Contents for ULG

Page 1: ...1 16 WWW DDTOP COM ULG ULG S BI COLOR GLASS TUBE LEBEL GAUGE ULG Operation Manual ULG DT JS 1010 2018 A...

Page 2: ...er may be destroyed Trademark Copyright and Restriction Instructions DDTOP Dandong Top Electronics Instrument Group Co Ltd Dandong Top Pump Co Ltd DDTOP are registered trademarks of the company The pe...

Page 3: ...dong Top Electronics Instrument Group Co Ltd does not provide any express or implied warranty Quality ISO9001 Dandong Top Electronics Instrument Group Co Ltd has passed the ISO9001 quality system cert...

Page 4: ...onal Schematic 7 5 9 5 Unpacking and Inspection 9 5 1 9 5 1 Unpacking Inspection Notice 9 5 2 11 5 2 Check Content 11 6 11 6 Installation 11 6 1 11 6 1 Installation Tool 11 6 2 11 6 2 Installation Tec...

Page 5: ...able local national international standards codes and procedures Be sure to install the equipment in Intrinsically safe or non flammable site operating procedures 1 2 1 2 Process leaks can cause serio...

Page 6: ...alve 2 2 Compression Body 3 3 Socket Head Cap Screws 4 4 Graphite Filler 5 5 Quartz Glass Tube 6 6 Ruler 2 2 2 2 Operating Principle According to the principle of the connector the level in the contai...

Page 7: ...dity 20 3 3 Technical Characteristics 3 1 3 1 Main Performance 3 1 1 JB T9243 3 1 1 Product Performance Standards JB T9243 glass tube level gauge 3 2 3 2 Main Parameters 3 2 1 0 3MPa 3 2 1 Needle valv...

Page 8: ...Schematic S1 Glass Tube Level Gauge 2 2 S2 Figure 2 2 Dimensional Schematic S2 Glass Tube Level Gauge 2 3 S4 Figure 2 3 Dimensional Schematic S4 Glass Tube Level Gauge 2 4 S5 Figure 2 4 Dimensional S...

Page 9: ...9 16 WWW DDTOP COM 2 3 S4 Figure 2 3 S4 Glass Tube Level Gauge 2 4 S5 Figure 2 4 S5 Glass Tube Level Gauge 5 5 Unpacking and Inspection 5 1 5 1 Unpacking Inspection Notice 5 1 1 3...

Page 10: ...1 Check whether the product nameplate Figure 3 is consistent with the supply list information 3 Figure Product Nameplate 5 1 2 5 1 2 According to the packing list check the quantity of each part and...

Page 11: ...onnections 6 1 2 6 1 2 Level 6 2 6 2 Installation Technical Requirements 6 2 1 6 2 1 Before installing the level gauge it is necessary to measure whether the center distance of the flange on the conta...

Page 12: ...12 16 WWW DDTOP COM 4 Figure 4 Debugging 7 1 1 4...

Page 13: ...the medium to flow into the level gauge Valve 4 7 5 2 4 7 5 Fully open the upper and lower valves of the gauge Valve 2 Valve 4 8 8 Failure Analysis and Elimination Fault Phenomenon Reason Method of E...

Page 14: ...es Valve 1 Valve 2 Valve 3 Valve 4 remove the drain plug and drain the residual medium See Figure 5 9 2 2 6 9 2 2 Remove the hexagon socket head cap screws diagonally See Figure 6 9 2 3 9 2 3 After re...

Page 15: ...ll and the end face of the glass tube is basically the same as that of the shell 9 4 2 9 4 2 Insert graphite packing ring into both ends of quartz glass tube 9 4 3 9 4 3 Install the compression body a...

Page 16: ...16 16 WWW DDTOP COM...

Reviews: